My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 10/23/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Interwest Construction 10/23/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:00:58 AM
Creation date
2/2/2018 10:00:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
10/23/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 2 <br /> Change Order Effective Date: 10-02-2017 <br /> CONTRACTOR <br /> By ‘CIAACt. Date: /CAI / 1 7 <br /> Officer <br /> cer <br /> Exhibit A—Description of Changed Work <br /> Per Contract Special Provision 1-05.4, the City was to provide survey staking for slope stakes, curb <br /> grade and flatwork, paving and underground utilities. ICI will self-perform this work. The scope of <br /> work shall include all required survey for the project with the exception of the survey work that is <br /> performed by 1 Alliance Geomatics under Bid Item A-003. <br /> Exhibit B—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Exhibit C—New Bid Item, Measurement and Payment <br /> New Bid Item A-300— SITE AND UTILITY SURVEY— <br /> Quantity: 1 LS <br /> Unit Price: $28,000.00 <br /> Total Cost: $28,000.00 <br /> Measurement: "Site and Utility Survey" shall be measured lump sum. <br /> Payment: "Site and Utility Survey" shall include all labor, equipment and materials necessary to <br /> perform the required survey as described above. <br /> ATTACHMENT ONE FOLLOWS(3 Additional Page) <br /> Interwest Change Proposal#01, Dated 9/26/17 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.