My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 10/23/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Interwest Construction 10/23/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:00:58 AM
Creation date
2/2/2018 10:00:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
10/23/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> September 26,2017 <br /> COP 001 <br /> Ken Kettel,Engineer <br /> City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: Grand Ave Bridge <br /> PW 3588 <br /> COP 001, Roadway Surveying <br /> Mr. Kettel: <br /> Interwest Construction,Inc. (Interwest) is providing the change order proposal as requested by the Engineer to price <br /> the addition of Roadway Surveying. This proposal totals $28,000.00 <br /> Interwest will perform the work with its own forces.A breakdown of the charges is attached for your reference. <br /> Please feel free to contact me with any questions or concerns you may have regarding this request. <br /> Respectfully submitted, <br /> INTERWEST CONSTRUCTION,INC. <br /> 6LOO•Aka &,()/st- <br /> Dana Orbe, P.E. <br /> Project Manager <br /> 609 North Hill Blvd. • Burlington, WA 98233 <br /> www.interwest.biz <br /> Estimating Dept. Fax (360)757-6464 <br /> Phone (360) 757-7574 Fax(360) 757-4196 <br /> Contractor License INTERCI121 OF <br />
The URL can be used to link to this page
Your browser does not support the video tag.