My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction 10/23/2017 Change Order 2
>
Contracts
>
Capital Contract
>
Interwest Construction 10/23/2017 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:00:58 AM
Creation date
2/2/2018 10:00:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction
Approval Date
10/23/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Ave Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reference: Grand Avenue Park Bridge <br /> This proposal is valid for 60 days <br /> Scope of Services: Civil Landing/Frontage Work <br /> Services: <br /> 1) Control- <br /> ICI will occupy and verify owner provided control network is within the tolerances allowable <br /> by project and trade specifications. ICI will establish secondary control as needed to <br /> complete this scope of the project. <br /> Scope Value $3,500.00 <br /> 2) TESC- <br /> ICI will stake all saw cuts and limits of construction. Staking will be placed at begin, end, <br /> angle points, PC's, PT's,and inter-visibly at no greater than 50' intervals. <br /> Scope Value $3,500.00 <br /> 3) Grading- <br /> ICI will stake slope stakes for the slope protection area. ICI will provide rough grading as <br /> needed for site prep at landings and frontages. <br /> Scope Value $3,500.00 <br /> 4) Utilities- <br /> ICI will stake double offset's to all utility structures at landings. ICI will stake offsets to all <br /> water line angle points,vertical bends, and tee's at landings and frontages. <br /> Scope Value $5,250.00 <br /> 5) Hardscape- <br /> ICI will stake offsets to all TBC and edge of hardscape concrete at both landing and <br /> frontages. <br /> Scope Value $12,250.00 <br /> Proposal Value $28,000.00 <br /> Interwest Construction Inc. <br /> 609 North Hill Blvd., Burlington, WA, 98233; Phone: (360)757-7574, Fax: (360) 757-4196 <br /> http://www.interwest.biz/ <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.