My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 12/5/2018 Change Order 3
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 12/5/2018 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:05:22 AM
Creation date
2/2/2018 10:05:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
12/5/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0000801
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Project: Grand Avenue Park Bridge <br /> Change Order No.: 3 <br /> Change Order Effective Date: 9-21-2017 <br /> CONTRACTOR <br /> By atakje Date: 14/17 /17 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> • The domestic waterline material installed on the project was changed from the special lining, as <br /> specified in SP 9-30.1(1), to the City of Everett Standard Specification 5-6.2. This will affect <br /> the material cost of 6", 8" and 12"water. <br /> • The existing water vault and 8" Double Check Detector Assembly was removed and relocated, <br /> in lieu of removing and replacing with a new water vault per Bid Item A059. Bid Item A059 is <br /> eliminated with this change order and payment for relocating was paid via time and materials. <br /> • Existing 2" water meter is not an irrigation meter, as called out on sheet C5.0. The meter is a <br /> domestic line that serves the Port of Everett Guest Dock. This meter shall be relocated and <br /> connected to the new 8" line just south of the relocated, existing water vault. Payment was <br /> included in the work while relocating the existing water vault. <br /> Exhibit B—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached. <br /> Measurement and Payment <br /> Bid item A059—Water Vault is eliminated from the contract. <br /> "DI Pipe Lining Credit_In Diam" shall be measured by the LF and include the material cost <br /> difference from the special lining per SP 9-30.1(1)to the City of Everett Standard 5-6.2 <br /> New Bid Item for"RELOCATE EX WATER VAULT AND 2" METER" shall be paid LS and include <br /> all labor, equipment, materials, overhead and profit as detailed in the attached worksheets for work that <br /> occurred on 9/21/17. <br /> ATTACHMENT ONE FOLLOWS (Additional Pages) <br /> • New and Existing Bid Items <br /> • Interwest Change Proposal #01, Dated 10/26/17 <br /> • Interwest cost to relocate existing water vault and 2" domestic water meter <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.