Laserfiche WebLink
• <br /> GRAND AVE PARK BRIDGE Change Order: 3 <br /> BASIS OF PAYMENT: <br /> REVISED Estimated Change Order$$ <br /> Item No. Description Estimated Contract Units Unit Price Adjustment <br /> Quantity Quantity <br /> Schedule Bid Item Increase or Decrease: <br /> A59 WATER VAULT N 0.00 1.00 LS $ 16,000.00 $ (16,000.00) <br /> cp REVISED Estimated REVISED Change Order$$ <br /> Item No. Description ° Estimated Contract Units <br /> Quantity Quantity Unit Price Adjustment <br /> Newly Added Bid Items: <br /> A302 DI PIPE LINING CREDIT 6 In DIAM N 20.00 0.00 LF $ (2.52) $ (50.40) <br /> A303 DI PIPE LINING CREDIT 8 In DIAM N 145.00 0.00 LF $ (3.55) $ (514.75) <br /> A304 DI PIPE LINING CREDIT 12 In DIAM N 85.00 0.00 LF $ (2.17) $ (184.45) <br /> A305 RELOCATE EX WATER VAULT AND 2" METEF N 1.00 0.00 LS $ 7,366.67 $ 7,366.67 <br /> Subtotal: $ (9,382.93) <br /> Change Order Total: $ (9,382.93) <br /> Change Order Page 2 <br />