My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R L Alia Company 11/28/2017 Change Order 1
>
Contracts
>
Capital Contract
>
R L Alia Company 11/28/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2018 10:23:48 AM
Creation date
2/2/2018 10:23:46 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R L Alia Company
Approval Date
11/28/2017
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Hayes Street Regulator & CSO Controls
Public Works WO Number
UP3398-31
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000647
Total Compensation
$77,973.08
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
R L Alia Company 5/4/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Hayes Street Regulator&CSO Control <br /> Change Order No.1 <br /> Change Order Effective Date: 10/18/17 <br /> CONTRACTOR <br /> l <br /> B Date: 1/ _i7 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> 1 <br /> This Change Order#1 modifies 5 existing bid items of the proposal and adds 1 new item to the <br /> contract as follows: I� <br /> Modified Items: <br /> Item#5—Traffic Control Labor. Modify existing bid item#5 titled, "Traffic Control Labor", by <br /> deleting 2,000 hours of Traffic Control Labor at the unit price of$39.00 per hour,resulting in a <br /> $78,000.00 decrease to the contract amount. <br /> Item#12—Crushed Surfacing Base Course. Modify existing bid item#12 titled, "Crushed <br /> Surfacing Base Course",by adding 800 tons of Crushed Surfacing Base Course at the unit price of <br /> $37.00 per ton, resulting in a$29,600.00 increase to the contract amount. <br /> 1 <br /> Item#13—HMA CL '/2-inch PG 64-22. Modify existing bid item #13 titled, "HMA CL Y2-inch PG <br /> 64-22,by adding 100 tons of HMA CL %2-inch PG 64-22 at the unit price of$120.00 per ton, resulting <br /> in a$12,000.00 increase to the contract amount. <br /> Item#21 —LS#9 Structure, for Screening Equipment. Delete existing bid item#21 titled, "LS#9 <br /> Structure,for Screening Equipment", in its entirety,resulting in a$100,000.00 decrease to the contract <br /> amount. <br /> Item#32—Control Density Fill(CDF)for Filling Pipes. Modify existing bid item#32 titled, <br /> "Control Density Fill (CDF)for Filling Pipes", by deleting 180 cubic yards of Control Density Fill <br /> (CDF)for Filling Pipes at the unit price of$200.00 per cubic yard,resulting in a$36,000.00 decrease <br /> to the contract amount. <br /> The net result of the above five (5)modified items results in a contract price decrease of$172,400.00. 1 <br /> New Item: <br /> Item#54—LS#9 Modified Screen Vault Structure. Add new item#54 titled, "LS#9 Modified <br /> Screen Vault Structure", to the contract in the agreed lump sum price of$250,373.08. <br /> The net result of the five (5)modified bid items and the one(1)new added item results in$77,973.08 <br /> increase to the contract amount. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.