My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/01/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/01/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 10:31:52 AM
Creation date
2/7/2018 10:31:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> • Project Coordination Meetings: HWA will attend up to one(1)project coordination <br /> meeting at Perteet's Everett Office. HWA's attendance will be used to convey the <br /> geotechnical considerations of the site to Everett Transit and the design team. <br /> • Prepare Draft Geotechnical Engineering Report: HWA will prepare a draft geotechnical <br /> engineering report for the project. This report will contain the results of the geotechnical <br /> engineering investigation, including description of surface and subsurface conditions;a site <br /> plan showing exploration locations and other pertinent features; summary boring logs;and <br /> laboratory test results. The report will provide geotechnical recommendations for each of the <br /> proposed improvements. <br /> • Prepare a Final Geotechnical Engineering Report: HWA will fmalize our geotechnical <br /> report once we receive review comments from Perteet and the Everett Transit. <br /> Project Management <br /> • Invoice Generation and Processing:HWA will prepare monthly invoices, and progress <br /> reports for the duration of the design phase of the project. <br /> • Geotechnical Task Management: HWA will provide geotechnical task management to all <br /> geotechnical related aspects of the project. HWA will correspond with the City and the <br /> design team in the form of emails,fax, and telephone calls,as necessary. <br /> ASSUMPTIONS <br /> • The geotechnical explorations proposed herein will not be used to assess site <br /> environmental conditions. However,visual or olfactory observations regarding potential <br /> contamination will be noted. Analysis,testing, storage,and handling of potentially <br /> contaminated soil and ground water(either sampled or spoils from drilling)are beyond <br /> this scope of services. If contaminated soils and/or ground water are encountered,the <br /> material will be.properly contained on-site for disposal as mutually agreed upon without <br /> additional cost to HWA. <br /> • All non-contaminated drilling spoils and related debris will be drummed on site and <br /> transported off site for disposal by the drilling subcontractor. <br /> • HWA assumes that they will not attend any project coordination meetings other than the <br /> kick off meeting. <br /> • All Field explorations will be conducted between the hours of 8AM to 5PM. <br /> • No Phase 1 or Phase 2 Environmental Site Assessment will be completed by HWA. <br /> • All required rights of entry will be provided by Everett Transit or Perteet at no cost to <br /> HWA. <br /> • Onsite Infiltration will not be used for this project. <br /> • The borehole locations will be surveyed by others. <br /> • The site soils will support standard plan luminaire foundations design.No non-standard <br /> foundation design will be required. <br /> 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.