Laserfiche WebLink
`i/ <br /> • Relatively disturbed subsurface soil samples will be collected from the borings using the <br /> Standard Penetration Test(SPT)at intervals of 2.5 feet. <br /> DELIVERABLES <br /> Geotechnical Work Plan Memorandum <br /> Draft and Final Geotechnical Engineering Report <br /> 0'O <br /> We appreciate the opportunity to provide geotechnical services on this project. Please feel free to <br /> call if you have any questions or need additional information. <br /> Sincerely, <br /> HWA GEOSCIENCES INC. <br /> Arnralej bitti",;— <br /> Donald J.Huling,P.E. <br /> Geotechnical Engineer,Principal <br /> 108 <br />