Laserfiche WebLink
EVERE 1 I STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 <br /> • Draft Drainage Report at 60%PS&E(one[1] hard copy,comb bound,PDF) <br /> • Final Drainage Report at Bid-Ready PS&E(one [1]comb bound hard copy,one[1] electronic copy on CD <br /> in Word/Excel[editable] and PDF formats) <br /> Task 5— Environmental.Documentation and Permitting <br /> 5.1 City of Everett Permitting Documentation and Coordination <br /> Work Elements: <br /> • • Formal Pre-application Meeting(City of Everett). <br /> • Engineering Permit Application,Land Use Permit Application,and construction plan review submittal <br /> (City of Everett). <br /> • ROW Permit Application(City of Everett). <br /> • Utility Permit Applications(City of Everett). <br /> • NPDES Notice of Intent(State Department of Ecology). <br /> • SWPPP Preparation(State Department of Ecology). <br /> Assumptions: <br /> • No state or federal funds will be obligated for this project;no permits or review processes tied to state or <br /> federal funding will be triggered. <br /> • The project will trigger SEPA and local City of Everett permits and NPDES Stormwater General Permit. <br /> • Everett Transit will pay all permit fees. <br /> • Everett Transit may provide one(1)round of consolidated comments for both the pre-application <br /> meeting and for review of the permit submittal documents. <br /> • No additional environmental studies or permits are assumed. <br /> • Sign Permit Application(City of Everett)is excluded from this scope of services. <br /> Deliverables: <br /> • Pre-application Submittal Package and Pre-Application Meeting Minutes(draft and final with 60% <br /> plans) <br /> • Permit application packages(draft for Client review and final for meeting submittal): <br /> o Site related permit applications with site-civil construction package for submittal to the City of <br /> Everett <br /> o ROW Permit Applications to the City of Everett. <br /> o Utility Permit Applications to the City of Everett. <br /> o NPDES NOI and SWPPP submitted or prepared for State Department of Ecology <br /> o Area of Potential Effect screening memo and Form EZ-1 submitted to DAHP with follow-up <br /> coordination and the potential for limited tribal correspondence <br /> 9 <br /> File location:X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Eot_Scape_2018-1-10.docx <br /> 91 <br />