My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2927 WETMORE AVE 2018-02-12
>
Address Records
>
WETMORE AVE
>
2927
>
2927 WETMORE AVE 2018-02-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2018 7:44:15 AM
Creation date
2/12/2018 7:44:07 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2927
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> PIERCE DESIGN <br /> the 2015 IMC we feel that not installing a Type II hood meets the intent and purpose of the code and does not <br /> lessen heath, life and fire safety requirements. <br /> 4. The drawings should indicate how the ventilation will occur, per IMC section 403.1, 403.3.1.1 and WSEC C103.2 <br /> item 4. <br /> Response: Ventilation will occur by a means of natural ventilation(operable windows and doors)per section 401.2 <br /> and 402.1 and mechanical ventilation(exhaust fans) per 403.1, 403.3.1.1. Fan locations and minimum ventilation <br /> rates are located on Sheet E1.0. Additional ventilation requirements, per design/build system and differed submittal. <br /> a) The existing in-line heater shown above the ceiling in the new prep area should be shown to meet the <br /> requirements of the WSEC C403. How is the heat transferred through the ceiling to the prep area? Please <br /> identify the fuel source for this heater. <br /> Response: Fuel source for the existing heaters are natural gas, and noted on detail 1, Sheet A3.0. The heat is not <br /> transferred through the ceiling into the prep area, it supplies heating to the main cafe space. Specification cut sheet <br /> is included, Reznor model UDAP. Compliance with WSEC C403 Mechanical Systems is deferred until a qualified <br /> HVAC technician or engineer has qualified the system and prepared a mechanical permit submittal, although we <br /> don't anticipate replacing or altering the existing heaters per C503.4. <br /> 5. Please indicate the current mechanical system locations and cfm for the coffee shop and toilet rooms,per IMC Table <br /> 403.3.1.1 requirements for Food and Beverage Service and requirements for Public Spaces Public Toilet rooms. <br /> Response: Prep area and toilet room fan c.f.m. rates are shown on E.1.0, additional ventilation requirements, per <br /> design/build system and differed submittal. <br /> 6. A commercial kitchen plumbing permit application is required. <br /> Response: A separate commercial plumbing permit will be pulled. <br /> Regards, <br /> Wesley Pierce <br /> Project Designer <br /> Pierce Design <br /> Please submit your revisions using the following protocol: <br /> Please review and respond to the comments below. Plan review will resume when the requested information is <br /> submitted. All required submittals must be of sufficient detail and information to ensure that the proposed structures will <br /> be constructed in compliance with all adopted codes, with two sets of drawings submitted for revisions.All revisions <br /> require the person delivering the drawings to replace revisions into the two review sets here at our offices. For significant <br /> revisions,please provide two full replacement sets. If the revisions are coming directly from the blue-printer, please make <br /> arrangements with them to print two replacement sets. <br /> CORRECTIONS RESPONSE LETTER PAGE 4 of 4 <br /> Pierce Design 2300 W Commodore Way Suite 201 Seattle,WA 98199 T 206-792-9396 E-mail wes@wespierce.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.