Laserfiche WebLink
• <br /> a. The code analysis on the drawings should be revised to show a maximum of 49 <br /> persons instead of 65. <br /> 4. The drawings should indicate specific signage at the main entrance door and the rear <br /> exit door to indicate that these doors will be open during business hours, per IBC <br /> section 1010.1.9.3, 2.2. <br /> Construction <br /> 1. Please provide details of the new ceiling in the prep area. The ceiling details should be <br /> shown on the drawings, and in section should show a 2 inch angle at the wall, per the <br /> Northwest Ceiling Bureau details on document 401. <br /> 2. Safety glazing should be shown on all door and window elevations as required by IBC <br /> section 2406.4. <br /> 3. Please indicate wall and ceiling sections for the new walls, and target those sections to <br /> the plans. This information should show if the walls are floor to underside of structure, <br /> or a different configuration. <br /> 4. Please confirm if doors 3, 4, and 5 are existing or new doors. <br /> 5. Please indicate safety glazing on the schedules for door 1 and window 2. <br /> Accessibility <br /> 1. The sales and service counter, cabinet niche for water service, and bus station should be <br /> shown in section and elevation to meet accessibility requirements of ICC-A117.1-2009 <br /> Chapters 9 for service counters and section 309 for reach ranges. <br /> 2. The toilet paper dispensers should be shown on the toilet room elevations to meet the <br /> requirements of ICC-A117.1-2009 section 604.7. <br /> 3. Door hardware should be shown to be accessible on the door schedule, for both new <br /> and existing doors. <br /> 4. Please show the clear floor space per section 305.3 beyond the arc of the door, in <br /> addition to the 5'turning space, per ICC-A117.1-2009 section 603.2.2, exception 2. <br /> Energy <br /> 1. Please include a calculated lighting summary from the forms available on NEEC.NET to <br /> verify compliance for the interior lighting power allowances per WSEC table C405.2 (1). <br /> Mechanical (Deferred submittal) <br /> 1. A change in occupancy to A-2 requires full compliance with the IMC, per IMC section <br /> 102.5. <br /> 2. The new prep area requires mechanical ventilation, per IMC section 401.2, as amended <br /> by the State of Washington. <br /> 3. A Type II hood should be shown above the dishwasher in the coffee bar, per IMC <br /> section 507.3. <br /> 4. The drawings should indicate how the ventilation will occur, per IMC section 403.1, <br /> 403.3.1.1 and WSEC C103.2 item 4. <br /> a. The existing in-line heater shown above the ceiling in the new prep area should <br /> be shown to meet the requirements of the WSEC C403. How is the heat <br /> transferred through the ceiling to the prep area? Please identify the fuel source <br /> for this heater. <br /> 5. Please indicate the current mechanical system locations and cfm for the coffee shop and <br /> toilet rooms, per IMC Table 403.3.1.1 requirements for Food and Beverage Service and <br /> requirements for Public Spaces Public Toilet rooms. <br /> 6. A commercial kitchen plumbing permit application is required. <br /> CITY OF EVERETT PERMIT SERVICES 3200 CEDAR ST, EVERETT, WA 98201 425-257-8810 <br /> website: www.everettwa.qov/permit January 24, 2017 email: everetteps©everettwa.qov f <br />