Laserfiche WebLink
Within Lawn Areas(5 percenSganic content) -Place and rototill 1.75 ins of composted material <br /> into 6.25 inches of replaced soil(a total amended depth of about 9.5 inches,for a settled depth of 8 <br /> inches). Subsoils below this layer should be scarified at least 4 inches,for a finished minimum depth of 12 <br /> inches of uncompacted soil. Water or roll to compact soil to 85 percent of maximum. Rake to level, and <br /> remove surface woody debris and rocks larger than 1 inch in diameter. <br /> 0 OPTION 3- Import Topsoil Meeting Organic Matter Content Standards: <br /> Scarify or till subgrade in two directionsto 6 inches depth. Entire surface should be disturbed <br /> by scarification. Do not scarifywithin drip line of existing trees to be retained. <br /> Within Stormwater Drainage System locations or Landscaped Areas(10 percent organic content)- <br /> Use importedtopsoil mix containing 10 percent organic matter(typically around 40 percent <br /> compost). Soil portion must be sand or sandy loam as defined by the USDA. Place 3 inches of <br /> imported topsoil mix on surface and till into 2 inches of soil. Place 3 inches of topsoil mix on the <br /> surface. Rake smooth and remove surface rocks over 2 inches diameter. Mulch planting beds with 2 <br /> inches of organic mulch. <br /> Within Lawn Areas(5percent organic content) - Use imported topsoil mix containing 5 percent <br /> organic matter(typically around 25 percent compost). Soil portion must be sand or sandy loam as <br /> defined by the USDA. Place 3 inches of imported topsoil mix on surface and till into 2 inches of soil. <br /> Water or roll to compact soil to 85 percent maximum. Rake to level,and remove surface rocks larger <br /> than 1 inch in diameter. <br /> (Page 5 of 8 <br /> CITY OF EVERETT 13200 Cedar Street I EvereL, WA 98201 1425-257-8810 Ieverettwa.goy <br />