My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10122 7TH AVE SE 2018-02-12
>
Address Records
>
7TH AVE SE
>
10122
>
10122 7TH AVE SE 2018-02-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2018 9:15:17 AM
Creation date
2/12/2018 9:14:53 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
10122
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Considering option 3. BM10.50 Downspout dispersion, gravel-fillI trenches are not feasible <br /> as well due to the size of trench required and the requirement of having a vegetated flowpath of <br /> at least 25 feet in length. <br /> Splash blocks are proposed to be used for two of the downspouts locate at the southeast and <br /> southwest of the duplex structure discharging to a vegetated flow path toward north (see plans). <br /> A shallow awale will be installed on the north side of the driveway. A berm will line the <br /> property line and the east end of the swale (see plans). <br /> **Please Note:At a minimum,you must establish good soil quality and depth in all areas that will <br /> remain vegetated after your project is complete, including lawn and landscaped areas. One of the <br /> three following options must be chosen(Select Check Boxes as applicable) per BMP 12.20: <br /> © OPTION 1- Amend Existing Soils in Place: <br /> Scarify or till existing subgrade to 4 inches depth (or to depth needed to achieve a total depth of 12 <br /> inches of uncompacted soil after calculated amount of amendment is added,see specific subsections <br /> below). Entire surface should be disturbed by scarification. Do not scarify within drip line of existing <br /> trees to be retained. <br /> Within Stormwater Drainage System locations or Landscaped Areas (10percent organic content)- Place <br /> and rototill 3 inches of composted material into 5 inchesof soil(a total depth of about 9.5 inches,for a <br /> settled depth of 8 inches). As noted previously, subsoils below this layer should be scarified at least <br /> 4 inches,for a finished minimum depth of 12 inches of uncompacted soil. Rake beds to smooth and <br /> remove rocks largerthan 2 inches diameter. Mulch areas with 2 inches of organic mulch. <br /> Within Lawn Areas (5percent organic content)- Place and rototill 1.75 inches of composted material <br /> into 6.25 inches of soil(a total amended depth of about 9.5 inches,for a settled depth of 8 inches). As <br /> noted previously,subsoils below this layer should be-scarified at least 4 inches,for a finished <br /> minimum depth of 12 inchesof uncompacted soil. Water or roll to compact soil to 85 percent of <br /> maximum. Rake to level, and remove surface woody debris and rocks largerthan 1 inch in diameter. <br /> II OPTION 2- Stockpile Site Topsoils Prior to Grading for Reapplication: <br /> If placed topsoil plus compost or other organic material will amount to less than 12 inches: scarify or <br /> till subgrade to depth needed to achieve 12 inches of loosened soil after topsoil and amendment are <br /> placed. Entire surface should be disturbed by scarification. Do not scarify within drip line of existing <br /> trees to be retained. <br /> Stockpile and cover soil with weed barrier material that sheds moisture yet allows air transmission, <br /> in approved location,prior to grading. <br /> Replace stockpiled topsoil prior to planting. <br /> Within StormwaterDrainage System locations or Landscaped Areas (10percent organic content)- Place <br /> and rototill 3 inches of composted material into 5 inches of replaced soil (a total depth of about <br /> 9.5 inches,for a settled depth of 8 inches). Subsoils below this layer should be scarified at least 4 <br /> inches,for a finished minimum depth of 12 inches of uncompacted soil. Rake beds to smooth and <br /> remove rocks larger than 2 inches in diameter. Mulch areas with 2 inches of organic mulch or stockpiled <br /> duff. <br /> Page 4 of 8 <br /> CITY OF EVERETT 13200 Cedar Street I Everett, WA 98201 1425-257-8810 jeverettwd.guv <br />
The URL can be used to link to this page
Your browser does not support the video tag.