My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HWA GEOSCIENCES INC. <br /> GeoterljnfrUI& Pavement En ineer n �� r . 1 <br /> g i �• Ilyilin��.oloKy � Geoenl�re:}�!+,r�rr a (!: (r.• i+;�� . ,. ..,,,. <br /> January 9, 2018 <br /> HWA Project No. 2017-P124-21 <br /> Perteet <br /> 2707 Colby Avenue <br /> Suite 900 <br /> Everett, Washington 98201 <br /> Attention: Darrell Smith, P.E. <br /> Subject: Geotechnical Engineering Scope of Work <br /> Everett Station Park and Ride Expansion <br /> Everett,Washington <br /> Dear Darrell: <br /> As requested, HWA GeoSciences Inc. (HWA) is pleased to present this proposed scope of work <br /> for geotechnical engineering services associated with the Everett Station Park and Ride <br /> Expansion Project in Everett, Washington. This scope of work is based on our understanding of <br /> the project and conversations we had with Perteet. <br /> PROJECT UNDERSTANDING <br /> It is our understanding that the Everett Transit proposes to expand the Everett Transit Center <br /> Park and Ride facility. This expansion will include extending the parking lot to the south. The <br /> parking lot expansion will include an asphalt pavement section, additional illumination and <br /> stormwater facilities. Based on our understanding of the project objectives, HWA proposes the <br /> following geotechnical engineering services scope of work for the project. <br /> GEOTECHNICAL SERVICES SCOPE <br /> The proposed work will include the following tasks: <br /> Geotechnical Project Setup: <br /> • Attend Project Kickoff Meeting: HWA will attend one project kickoff meeting with the <br /> Everett Transit and the design team. This meeting will review project objectives, <br /> communication protocol and schedule. HWA assumes that this meeting will take <br /> place at Perteet's Everett Office. <br /> • Collect and Review Available Geotechnical Data: HWA will review readily available and <br /> relevant information along the project site. This review will include online <br /> geotechnical databases, geologic maps and HWA library. 21312 30th Drive SE <br /> Suite 110 <br /> Geotechnical Explorations: Bothell,WA 98021.7010 <br /> • Plan Field Exploration Program: HWA will plan and coordinate the Tel: 425.774.0106 <br /> geotechnical exploration program for the project. This will consist of Fax 425.774.2714 <br /> www.hwageo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.