My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 2/1/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 2/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 1:29:52 PM
Creation date
2/13/2018 9:11:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
2/1/2018
Council Approval Date
1/24/2018
End Date
12/31/2018
Department
Transportation Services
Department Project Manager
Tom Hingson
Subject / Project Title
Park and Ride Expansion at Everett Station
Tracking Number
0001060
Total Compensation
$249,892.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
conducting a series of geotechnical borings across the project site in support of pavement <br /> design, assessment of shallow groundwater conditions, retaining wall, luminaire foundation <br /> design. Planning will include identification of the location of the geotechnical borings, <br /> development of traffic control plans and coordination of required equipment. <br /> • Generate Geotechnical Exploration Figure: HWA will prepare a Geotechnical Exploration <br /> Figure associated with our proposed exploration program. This Figure will be submitted to <br /> the design team and Everett Transit for review and approval. The Figure will detail the type, <br /> location, and extent of proposed field explorations. The Figure will also be used for utility <br /> locating clearances and for permitting that may be necessary to access the exploration <br /> locations. We assume the Everett Transit or Perteet, in support of this project,will acquire <br /> and provide any required permits or right of entries at no cost to HWA. <br /> • Conduct Utility Locates for Geotechnical Borings: Prior to conducting our field <br /> explorations, HWA will mark the proposed exploration locations and arrange for utility <br /> locates using the Utility Notification Center. <br /> • Conduct Field explorations (Geotechnical Borings): HWA will conduct a series of up to 5 <br /> geotechnical borings across the project site to assess the subsurface soil and groundwater <br /> conditions. Each of these borings will be drilled to a depth of 20 to 30 feet below ground <br /> surface. Soil samples will be taken at 2.5 foot intervals for the full depth of the borings. <br /> • Generate Boring Logs and Assign Laboratory Testing: HWA will prepare summary <br /> boring logs and perform laboratory testing to evaluate relevant physical properties of the site <br /> soils. Laboratory testing would include moisture content, hydrometers, grain-size <br /> distribution, and Atterberg Limits. <br /> Geotechnical Design Services: <br /> • Evaluate Field and Laboratory Data: Based on the borings and the laboratory test results <br /> of selected samples, HWA will generate estimates of the soil strength and other properties <br /> needed to evaluate the effects the subsurface conditions will have on the proposed <br /> improvements. <br /> • Pavement Design Analyses: HWA will evaluate the results of the geotechnical explorations <br /> and develop pavement design recommendations for new asphalt pavement within the parking <br /> lot. <br /> • Luminaire Design and Recommendation: HWA will evaluate the data derived from our <br /> field investigations and laboratory testing to complete geotechnical engineering analyses to <br /> provide standard luminaire foundation recommendations. HWA assumes that luminaire <br /> foundations will be designed based on WSDOT standard plans and procedures. <br /> • Retaining Wall Design: HWA will develop design recommendations for proposed <br /> structural earth walls required for the project. <br /> • HWA QA/QC: HWA will have all design calculations and recommendations reviewed by a <br /> senior principal prior to distribution to the design team or the Everett Transit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.