Laserfiche WebLink
1 40-27 BUILDING <br />FORMED METAL WALL PANELS <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />B. Examine roughing -in for components and systems penetrating metal panels to verify <br />actual locations of penetrations relative to seam locations of metal panels before <br />installation. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 METAL PANEL INSTALLATION <br />A. Installation shall be in accordance with manufacturer's installation guidelines and <br />recommendations. <br />B. Install panels plumb, level, and true -to -line to dimensions and layout indicated on <br />approved shop drawings. <br />C. Cutting and fitting of panels shall be neat, square and true. Torch cutting is prohibited. <br />3.3 TRIM INSTALLATION <br />A. Place trim and trim fasteners only as indicated per details on the approved shop <br />drawings. <br />B. Apply sealant tape at trim, per manufacturer's details and approved shop drawings, for <br />weathertight installation. <br />3.4 CLEANING AND PROTECTION <br />A. Remove protective film immediately after installation. <br />B. Touch-up, repair or replace metal panels and trim that have been damaged. <br />END OF SECTION 07 42 13 <br />C06922.001.00 <br />074213-5 <br />05-22-14 <br />