My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40-27 BUILDING FORMED METAL WALL PANELS <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />C. Fasteners: Self -tapping screws, bolts, nuts, self-locking rivets and bolts, and other <br />suitable fasteners designed to withstand design loads. <br />2.4 FABRICATION <br />A. Metal wall panels shall be formed to overlap edges of adjacent panels which are then <br />mechanically attached through panel to supports using exposed fasteners. <br />B. Panels shall be factory formed. Field formed panels are not acceptable. <br />C. Trim Accessories: Provide manufacturer's standard extruded trim matching wall panel <br />material and finish.. <br />D. Mitered Corners: Structurally bonded , welded or riveted horizontal outside corners <br />matching metal wall panel material, profile and factory applied finish shall be fabricated <br />by metal wall panel manufacturer. <br />1. Field fabricated corners do not meet the requirements of this specification. <br />2.5 FINISHES <br />A. Steel: <br />1. Finish and Color: <br />a. Exposed Aluminum -Zinc Alloy -Coating; ASTM A792, Class AZ50 coating. <br />"Galvalume" or "Zincalume"protective coating. <br />1) Color: As selected by Architect from manufacturer's full range of <br />standard offerings. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance with <br />requirements for installation tolerances, metal panel supports, and other conditions <br />affecting performance of the Work. <br />1. Examine wall framing to verify that panel support members and anchorage have <br />been installed within alignment tolerances required by metal wall panel <br />manufacturer. <br />a. Verify that air- or water -resistive barriers have been installed over <br />sheathing or backing substrate to prevent air infiltration or water <br />penetration. <br />C06922.001.00 <br />074213-4 <br />05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.