Laserfiche WebLink
40-27 BUILDING <br />SUBMITTAL PROCEDURES I <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />PART 2 - PRODUCTS <br />2.1 SUBMITTAL PROCEDURES <br />A. General Submittal Procedure Requirements: Prepare and submit submittals required <br />by individual Specification Sections. Types of submittals are indicated in individual <br />Specification Sections. <br />1. Post electronic submittals as PDF electronic files through the Owner's <br />representative on the web address established for the Project. Architect, through <br />Owner's Representative, will return annotated file. <br />2. Submit electronic submittals via email as PDF electronic files. Architect, through <br />Owner's Representative, will return annotated file. Annotate and retain one copy <br />of file as an electronic Project record document file. <br />3. Action Submittals: Submit three paper copies of each submittal unless otherwise <br />indicated. Architect, through Owner's Representative, will return two copies. <br />4. Informational Submittals: Submit two paper copies of each submittal unless <br />otherwise indicated. Architect and Owner's Representative will not return copies. <br />5. Certificates and Certifications Submittals: Provide a statement that includes <br />signature of entity responsible for preparing certification. Certificates and <br />certifications shall be signed by an officer or other individual authorized to sign <br />documents on behalf of that entity. <br />a. Provide a digital signature with digital certificate on electronically submitted <br />certificates and certifications where indicated. <br />b. Provide a notarized statement on original paper copy certificates and <br />certifications where indicated. <br />B. Product Data: Collect information into a single submittal for each element of <br />construction and type of product or equipment. <br />1. If information must be specially prepared for submittal because standard <br />published data are not suitable for use, submit as Shop Drawings, not as Product <br />Data. <br />2. Mark each copy of each submittal to show which products and options are <br />applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's catalog cuts. <br />b. Manufacturer's product specifications. <br />C. Standard color charts. <br />d. Statement of compliance with specified referenced standards. <br />e. Testing by recognized testing agency. <br />f. Application of testing agency labels and seals. <br />g. Notation of coordination requirements. <br />h. Availability and delivery time information. <br />4. For equipment, include the following in addition to the above, as applicable: <br />a. Wiring diagrams showing factory -installed wiring. <br />b. Printed performance curves. <br />C. Operational range diagrams. <br />C06922.001.00 01 33 00 - 6 <br />05-22-14 ' <br />