My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 40-27 BUILDING CLOSEOUT PROCEDURES <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />1 <br />Complete the following cleaning operations before requesting inspection for <br />certification of Substantial Completion for entire Project or for a designated <br />portion of Project: <br />a. Clean Project site, yard, and grounds, in areas disturbed by construction <br />activities, including landscape development areas, of rubbish, waste <br />material, litter, and other foreign substances. <br />b. Sweep paved areas broom clean. Remove petrochemical spills, stains, <br />and other foreign deposits. <br />C. Rake grounds that are neither planted nor paved to a smooth, even - <br />textured surface. <br />d. Remove tools, construction equipment, machinery, and surplus material <br />from Project site. <br />e. Remove snow and ice to provide safe access to building. <br />f. Clean exposed exterior and interior hard -surfaced finishes to a dirt -free <br />condition, free of stains, films, and similar foreign substances. Avoid <br />disturbing natural weathering of exterior surfaces. Restore reflective <br />surfaces to their original condition. <br />g. Remove debris and surface dust from limited access spaces, including <br />roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and <br />similar spaces. <br />h. Sweep concrete floors broom clean in unoccupied spaces. <br />i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; <br />clean according to manufacturer's recommendations if visible soil or stains <br />remain. <br />j. Clean transparent materials, including mirrors and glass in doors and <br />windows. Remove glazing compounds and other noticeable, vision - <br />obscuring materials. Polish mirrors and glass, taking care not to scratch <br />surfaces. <br />k. Remove labels that are not permanent. <br />I. Wipe surfaces of mechanical and electrical equipment, elevator equipment, <br />and similar equipment. Remove excess lubrication, paint and mortar <br />droppings, and other foreign substances. <br />M. Clean plumbing fixtures to a sanitary condition, free of stains, including <br />stains resulting from water exposure. <br />n. Replace disposable air filters and clean permanent air filters. Clean <br />exposed surfaces of diffusers, registers, and grills. <br />o. Clean ducts, blowers, and coils if units were operated without filters during <br />construction or that display contamination with particulate matter on <br />inspection. <br />1) Clean HVAC system in compliance with NADCA Standard 1992-01. <br />Provide written report on completion of cleaning. <br />p. Clean light fixtures, lamps, globes, and reflectors to function with full <br />efficiency. <br />q. Leave Project clean and ready for occupancy. <br />Pest Control: Comply with pest control requirements in Division 01 Section <br />"Temporary Facilities and Controls." Prepare written report. <br />C06922.001.00 <br />01 77 00 - 5 <br />05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.