Laserfiche WebLink
40-27 BUILDING <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />3.2 <br />CLOSEOUT PROCEDURES I <br />D. Construction Waste Disposal: Comply with waste disposal requirements in Division 01 <br />Section "Temporary Facilities and Controls." <br />U <br />REPAIR OF THE WORK <br />Complete repair and restoration operations before requesting inspection for <br />determination of Substantial Completion. <br />B. Repair or remove and replace defective construction. Repairing includes replacing <br />defective parts, refinishing damaged surfaces, touching up with matching materials, <br />and properly adjusting operating equipment. Where damaged or worn items cannot be <br />repaired or restored, provide replacements. Remove and replace operating <br />components that cannot be repaired. Restore damaged construction and permanent <br />facilities used during construction to specified condition. <br />1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, <br />and other damaged transparent materials. <br />2. Touch up and otherwise repair and restore marred or exposed finishes and <br />surfaces. Replace finishes and surfaces that that already show evidence of <br />repair or restoration. <br />a. Do not paint over "UL" and other required labels and identification, <br />including mechanical and electrical nameplates. Remove paint applied to <br />required labels and identification. <br />3. Replace parts subject to operating conditions during construction that may <br />impede operation or reduce longevity. <br />4. Replace burned -out bulbs, bulbs noticeably dimmed by hours of use, and <br />defective and noisy starters in fluorescent and mercury vapor fixtures to comply <br />with requirements for new fixtures. <br />END OF SECTION 01 77 00 <br />C06922.001.00 01 77 00 - 6 <br />05-22-14 ' <br />