My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40-27 BUILDING <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />OPERATION AND MAINTENANCE DATA I <br />B. Format: Submit operations and maintenance manuals in the following format: <br />PDF electronic file. Assemble each manual into a composite electronically <br />indexed file. Submit on digital media acceptable to Architect. <br />a. Name each indexed document file in composite electronic index with <br />applicable item name. Include a complete electronically linked operation <br />and maintenance directory. <br />b. Enable inserted reviewer comments on draft submittals. <br />2. Three paper copies. Include a complete operation and maintenance directory. <br />Enclose title pages and directories in clear plastic sleeves. Architect, through <br />Owner's Representative, will return two copies. <br />C. Initial Manual Submittal: Submit draft copy of each manual at least 30 days before <br />commencing demonstration and training. Architect and Commissioning Authority will <br />comment on whether general scope and content of manual are acceptable. <br />D. Final Manual Submittal: Submit each manual in final form prior to requesting <br />inspection for Substantial Completion and at least 15 days before commencing <br />demonstration and training. Architect and Commissioning Authority will return copy <br />with comments. <br />Correct or revise each manual to comply with Architect's and Commissioning <br />Authority's comments. Submit copies of each corrected manual within 15 days of <br />receipt of Architect's and Commissioning Authority's comments and prior to <br />commencing demonstration and training. <br />PART 2 - PRODUCTS <br />2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY <br />A. Directory: Prepare a single, comprehensive directory of emergency, operation, and <br />maintenance data and materials, listing items and their location to facilitate ready <br />access to desired information. Include a section in the directory for each of the <br />following: <br />1. List of documents. <br />2. List of systems. <br />3. List of equipment. <br />4. Table of contents. <br />B. List of Systems and Subsystems: List systems alphabetically. Include references to <br />operation and maintenance manuals that contain information about each system. <br />C. List of Equipment: List equipment for each system, organized alphabetically by <br />system. For pieces of equipment not part of system, list alphabetically in separate list <br />D. Tables of Contents: Include a table of contents for each emergency, operation, and <br />maintenance manual. <br />C06922.001.00 01 78 23 - 2 <br />05-22-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.