Laserfiche WebLink
' 40-27 BUILDING STRUCTURE DEMOLITION <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />3.4 PREPARATION <br />A. Site Access and Temporary Controls: Conduct demolition and debris -removal <br />operations to ensure minimum interference with roads, streets, walks, walkways, and <br />other adjacent occupied and used facilities. <br />' <br />B. Temporary Facilities: Provide temporary barricades and other protection required to <br />prevent injury to people and damage to adjacent buildings and Boeing facilities to <br />' <br />remain until vacated and notified as unoccupied. <br />1. Provide protection to ensure safe passage of people around demolition area and <br />to and from occupied Boeing buildings. <br />C. Temporary Shoring: Provide and maintain shoring, bracing, and structural supports as <br />required to preserve stability and prevent movement, settlement, or collapse of <br />construction and finishes to remain, and to prevent unexpected or uncontrolled <br />' <br />movement or collapse of construction being demolished. <br />' 1. Strengthen or add new supports when required during progress of demolition. <br />3.5 DISPOSAL OF DEMOLISHED MATERIALS <br />A. General: Except for items or materials indicated to be recycled, reused, salvaged, <br />reinstalled, or otherwise indicated to remain on Owner's property, remove demolished <br />materials from Project site and legally dispose of them in an EPA -approved landfill. <br />1. Do not allow demolished materials to accumulate on -site. <br />' 2. Remove and transport debris in a manner that will prevent spillage on adjacent <br />surfaces and areas. <br />B. Burning: Do not burn demolished materials. <br />3.6 CLEANING <br />' A. Clean adjacent structures and improvements of dust, dirt, and debris caused by <br />demolition operations. Return adjacent areas to condition existing before demolition <br />' operations began. <br />END OF SECTION 02 41 19 <br />1 <br />C06922.001.00 <br />0241 19-3 <br />05-22-14 <br />