My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-27 2022-03-17
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-27
>
3003 W CASINO RD BLDG 40-27 2022-03-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 4:21:14 PM
Creation date
2/13/2018 1:19:39 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-27
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40-27 BUILDING <br />STRUCTURE DEMOLITION I <br />BRPH ARCHITECTS -ENGINEERS, INC. <br />D. Hazardous Materials: It is expected that hazardous materials will be encountered in <br />the Work. <br />E. Storage or sale of removed items or materials on -site is not permitted. <br />F. Utility Service: Maintain existing utilities indicated to remain in service and protect <br />them against damage during demolition operations. <br />1. Maintain fire -protection facilities in service during demolition, remediation and <br />salvage operations. <br />2. Maintain health, life safety and sanitation facilities during demolition, remediation, <br />and signage operations. <br />G. An independent contractor utilized by the recycler and is required to demonstrate <br />general liability insurance coverage that meets or exceeds industry standards. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 GENERAL <br />A. Demolition work shall be in accordance with demolition plan and notes. <br />3.2 EXAMINATION <br />A. Verify that utilities have been disconnected, drained, and capped. <br />B. Survey existing conditions and correlate with requirements indicated to determine <br />extent of demolition required. <br />C. Inventory and record the condition of items to be removed and reinstalled and items to <br />be removed and salvaged. <br />D. When unanticipated mechanical, electrical, or structural elements are encountered, <br />investigate and measure the nature and extent of conflict. Promptly submit a written <br />report to Boeing Construction Manager. <br />3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS <br />A. Existing Services/Systems: Maintain services/systems needed for Boeing operations <br />and or indicated on the plan to remain and protect them against damage during <br />demolition operations. <br />C06922.001.00 0241 19 - 2 <br />05-22-14 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.