My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers Inc 2/12/2018 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2018
>
GeoEngineers Inc 2/12/2018 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 10:14:27 AM
Creation date
2/15/2018 10:14:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers Inc
Approval Date
2/12/2018
Council Approval Date
1/31/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
7400 Block Larimer Road Stabilization
Public Works WO Number
PW3685 10 14
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$72,715.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services to City of Everett <br /> December 21, 2017 <br /> Page 2 <br /> At the conclusion of the construction activities,GeoEngineers will prepare a summary letter of our construction <br /> observation services. Based on our current understanding of the project, we anticipate that the services to be <br /> provided by GeoEngineers will include the following: <br /> 1. Part-time observation during grubbing and stripping activities along the existing slope and berm (Assume <br /> two site visits). <br /> 2. Part-time observation during construction of groundwater interceptor drain installation and geotextile <br /> placement activities(Assume five site visits). <br /> 3. Part-time observation during fill placement activities(Assume three site visits per week for 6 weeks). <br /> 4. Part-time observation during erosion control placement activities(Assume two site visits). <br /> 5. Part-time observation during roadway subgrade preparation,as necessary. (Assume two site visits) <br /> 6. Consultation through the construction phase of the project. <br /> 7. Prepare construction summary letter. <br /> GeoEngineers,Inc. <br /> File No.0661-113-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.