My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> payments, Contract decisions, acceptability of the Contractor's Work, and early possession. The <br /> Owner has the authority to accept or reject requests for progress payments that have been <br /> submitted by the Contractor and recommended by the Owner's Representative. The Owner has <br /> the authority to make determinations of the acceptability of the Work. The Owner also has the <br /> authority to accept or reject the Owner's Representative's recommendations regarding retention of <br /> defective Work. <br /> 3.2 Owner's Representative <br /> A. The Owner's Representative shall be satisfied that all the Work is being done in accordance with <br /> the requirements of the Contract. The Contract and Specifications give the Owner's <br /> Representative authority over the administration of the Contract. Whenever it is so provided in <br /> this Contract,the decision of the Owner's Representative shall be final. <br /> B. The Owner's Representative's decisions will be final on all questions including but not limited to, <br /> unless specifically assigned to an Architect or Engineer,the following: <br /> 1. Measurement of Work,whether lump sum,Force Account,or unit price; <br /> 2. Acceptability of rates of progress on the Work; <br /> 3. Interpretation of Drawings and Specifications with regard to administrative matters; <br /> 4. Determination as to the existence of changed or differing site conditions; <br /> 5. Fulfillment of the Contract by the Contractor; <br /> 6. Payments under the Contract including adjustment and; <br /> 7. Suspension(s)of Work. 1 <br /> C. If the Contractor fails to respond promptly to the requirements of the Contract or orders from the <br /> Owner's Representative: <br /> 1. The Owner's Representative may use the Owner's resources, other contractors, or other <br /> means to accomplish the Work, and <br /> 2. The Owner will not be obligated to pay the Contractor, and will deduct from the <br /> Contractor's payments, any costs that result when any other means are used to carry out the <br /> Contract requirements or Owner's Representative's orders. <br /> D. At the Contractor's risk,the Owner's Representative may suspend all or part of the Work if: <br /> 1. The Contractor fails to fulfill Contract terms, to carry out the Owner's Representative's <br /> orders, or to correct unsafe conditions of any nature; or I <br /> 2. It is in the public interest. <br /> E. The Owner's Representative and Owner shall have complete access to the Work and to the Site of <br /> the Work and to the places where Work is being prepared or where materials, Equipment, and <br /> machinery are being obtained for the Work. If requested by the Owner's Representative or <br /> Owner, the Contractor shall provide the assistance necessary for obtaining such access, and shall <br /> provide information related to the inspection of construction. Absence of such access or <br /> information, as needed, may result in the Owner's refusal to accept the Work. <br /> F. The Owner's Representative has the authority to recommend Change Orders, but does not have <br /> authority to approve Change Orders. Proposed Change Orders are subject to review and approval <br /> by the Owner. No proposed Change Order or any change of Contract Sum or Contract Time is <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.