My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> effective or binding upon the Owner unless and until the Mayor or his or her designee signs it, as <br /> ' authorized by City Council or by ordinance. <br /> G. To detail and illustrate the Work, the Owner's Representative may furnish to the Contractor <br /> additional Drawings and explanations consistent with the original Drawings. The Contractor shall <br /> perform the Work according to these additional Drawings and explanations. <br /> H. The Owner's Representative may appoint assistants and inspectors to assist in determining that <br /> the Work and materials meet the Contract requirements. Assistants and inspectors have the <br /> authority to reject defective material and suspend Work that is being done improperly, subject to <br /> the final decisions of the Owner's Representative or,when appropriate,the Owner. <br /> I. Assistants and inspectors are not authorized to accept work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br /> which does not meet the Contract requirements shall be at the Contractor's risk and shall not be a <br /> basis for a Contract Claim even if the Owner's Representative, inspectors or assistants purport to <br /> change the Contract. <br /> J. Assistants and inspectors may advise the Contractor of faulty Work or materials or infringements <br /> of the terms of the Contract; however, failure of the Owner's Representative or the assistants or <br /> inspectors to advise the Contractor does not constitute acceptance or approval. <br /> K. The Contractor shall submit supplemental working or detail drawings as required for the <br /> performance of the Work pursuant to 2.4. Submittals. Except as noted, all drawings and other <br /> Submittals shall be delivered directly to the Owner's Representative. The drawings shall be on <br /> sheets measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in multiples of 8 1 <br /> /2 by 11 inches, or other size approved by the Owner consistent with the Work to be detailed. <br /> Contractor shall provide drawings far enough in advance of ordering or installation to allow for <br /> review by the Owner's Representative or other agencies and possible resubmittal and further <br /> review after resubmittal. After a plan or drawing has been reviewed and returned to the <br /> Contractor, all changes proposed by the Contractor may be submitted to the Owner's <br /> Representative for review and comment. <br /> L. The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not <br /> impose any responsibility upon the Owner, nor does it relieve the Contractor of any responsibility <br /> 1 for the accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all <br /> risk and all costs of any Work delays caused by resubmittal or correction of Submittals. The <br /> Contractor shall allow sufficient time for Owner's review of Submittals and possible corrections <br /> by the Contractor so as not to delay the Work. <br /> M. The Contractor's Bid price shall include all costs of all Submittals, including, but not limited to, <br /> working, detail and shop drawings. <br /> ARTICLE 4 CONTRACTOR <br /> 4.1 Contractor's Representative <br /> A. The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. <br /> This person shall have authority to carry out the provisions of the Contract and to supply <br /> materials, Equipment,tools and labor without delay for the performance of the Work. <br /> B. Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br /> management of construction of projects of this size and type. These shall include, but not be <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.