My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> ' SPECIAL PROVISIONS GENERAL CONDITIONS <br /> to limit the location of such picketing so as to reduce the impact thereof upon neutral <br /> employers. <br /> C. The Owner will cooperate with the Contractor to accomplish the foregoing actions and will <br /> render assistance as may be in the best interests of the Owner. However, the Owner shall have <br /> the right to direct the Contractor to modify any of the foregoing actions the Contractor has taken <br /> or plans to take or to overrule such actions, to designate the entrances to be used as "primary" or <br /> "neutral" entrances, and to take appropriate legal action in order to protect the Owner's property <br /> ' and interests. In any event, the Contractor shall be liable for all Delays and costs, including costs <br /> to the Owner, and actual damages resulting from the relocation, rerouting, Delays or actions <br /> required to maintain the uninterrupted progress of the Work. Failure by the Contractor to take the <br /> ' actions described above or to comply with the directives of the Owner shall be considered a <br /> breach of this Contract and the Owner may terminate the Contract or suspend the Contractor as <br /> provided in this Contract. <br /> ARTICLE 8 MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION <br /> UTILITIES <br /> ' 8.1 General <br /> A. Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and <br /> ' pay for materials, labor, tools, Equipment, water, light, power, transportation, supervision, and <br /> temporary construction of any nature, and other services and facilities of any nature, whatsoever <br /> necessary, to execute, complete and deliver the Work within the specified time. Contractor shall <br /> ' be liable for all power and water costs until Substantial Completion,whether such power or water <br /> is provided by temporary or permanent facilities. Owner shall not be liable for any costs or <br /> Delays arising out of or caused by the availability or lack of availability of permanent power or <br /> ' utilities. Material and Equipment shall be new and of the specified quality. Equipment offered <br /> shall be new or current specified models. This requirement does not apply to minor details, or to <br /> thoroughly demonstrated improvements in design or in materials of construction. Construction <br /> Work shall be executed in conformity with the standard practice of the trade. <br /> ' 8.2 Product Data <br /> A. When specified, the Contractor shall provide data required for-inspecting, testing, operating, or <br /> maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the <br /> time the referenced material or Equipment is delivered to the job Site. The data shall be as <br /> specified and shall include, unless otherwise specified, such items as shop drawings, erection <br /> ' drawings, reinforcing steel schedules, testing and adjusting instructions, operations manuals, <br /> maintenance procedures, parts lists, and record drawings. Such data shall be provided as part of <br /> the Work under this Contract and its acceptability determined by the Owner in its sole discretion. <br /> 8.3 Quality <br /> ' A. Where detailed Specifications of materials, Equipment, or construction Work are not set forth, the <br /> Contractor shall perform the Work using material's and Equipment of a quality comparable to the <br /> materials and workmanship specified for the other parts of the Work, from firms of established <br /> good reputations, and shall follow standard practices to perform construction Work of good <br /> quality in a workmanlike way. Work performed shall be in conformity and harmony with the <br /> intent to secure the standard of construction and Equipment of Work as a whole and in part. All <br /> Work must comply and conform to applicable building codes in effect when the Work is <br /> performed. <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.