My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS t <br /> 8.4 Material and Equipment Specified by Name <br /> A. When material or Equipment is specified by reference to patents, brand names, or catalog I <br /> numbers, the Owner will not usually consider or approve a substitution. However, the Contractor <br /> may offer substitutions of products it considers to be equal to that specified, but the Owner is not <br /> obliged or required to consider or accept such offered substitution. ' <br /> 8.5 Requests for Substitution <br /> A. The Contractor may offer material or Equipment of equal or better quality and performance in <br /> substitution for those specified. Only the Contractor may request substitutions. The Contractor's <br /> offers of substitution shall be made in writing to the Owner's Representative and shall include <br /> sufficient data to enable the Owner's Representative to assess the acceptability of the material or <br /> Equipment for the particular application and requirements. The Owner and Owner's <br /> Representative are not required or obligated to consider or review a request for substitution and <br /> may,in their sole discretion and option, consider or review such requests. ' <br /> B. If the offered substitution requires changes to or coordination with other portions of the work,the <br /> Contractor shall include with its substitution request any such drawings and details showing such <br /> changes. The Contractor agrees to perform these changes as part of the substitution of material or <br /> Equipment at no additional cost to the Owner. Approval of a substitution request shall not relieve <br /> the Contractor from responsibility for the efficiency, quality, and performance of the substitute <br /> material or Equipment, in the same manner and degree as the material and Equipment originally ' <br /> specified. Any cost differential associated with a substitution shall be reflected in the offer. If <br /> the Owner approves the substitution, the Contract Documents shall be modified by a Change <br /> Order modifying the Contract Sum in the amount of the cost differential. ' <br /> 8.6 Demonstration of Compliance with Contract Requirements <br /> A. Inspection ' <br /> 1. The burden of proving the constructed Work complies with the Contract Documents shall be <br /> on the Contractor at all times. To demonstrate its compliance with the Contract <br /> requirements, the Contractor shall assist the Owner's Representative in his or her inspection <br /> and observation of the Work. The Contractor shall grant the Owner's Representative access <br /> to the Work and Work Site, and to places where Work is being prepared, or where materials, <br /> Equipment, or machinery are being obtained for Work. The Contractor shall provide <br /> information requested by the Owner's Representative in connection with inspection work. <br /> 2. If the Contract Documents, laws, ordinances, or any public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br /> Owner's Representative adequate prior written Notice of the availability of the subject Work <br /> for examination, which Notice shall be not less than two(2) working days. <br /> 3. Inspection and quality control tests performed on Work by the Contractor by the Owner's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the Owner's <br /> Representative for the Contractor's compliance with these Contract Documents. Contractor <br /> remains responsible and liable for all errors, defects or a lack of quality not discovered by <br /> inspection or observation. <br /> 4. If parts of the Work are covered prior to inspection or observation, the cost of exposing the <br /> Work for inspection and closing and re-covering shall be borne by the Contractor regardless <br /> of whether the Work is found to be in compliance with the Contract. <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -34 t <br />
The URL can be used to link to this page
Your browser does not support the video tag.