Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> be defective, Contractor shall promptly, without cost to Owner and in accordance with Owner's <br /> written instructions: <br /> 1. repair such defective land or areas; or <br /> 2. correct such defective Work; or <br /> 3. if the defective Work has been rejected by Owner, remove it from the Project and replace it <br /> with Work that is not defective, and <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work 1 <br /> of others or other land or areas resulting there from. <br /> B. If Contractor does not promptly comply with the terms of Owner's written instructions, or in an <br /> emergency where Delay would cause serious risk of loss or damage, Owner may have the_ <br /> defectiveWork corrected or repaired or may have the rejected Work removed and replaced. All <br /> claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, <br /> architects, attorneys, and other professionals and all court or arbitration or other dispute <br /> resolution costs) arising out of or relating to such correction or repair or such removal and <br /> replacement (including but not limited to all costs of repair or replacement of Work of others) <br /> will be paid by Contractor. I <br /> C. The Owner is hereby authorized to make such repairs if, ten (10) days after giving of such notice <br /> to the Contractor, the Contractor has failed to make or undertake the repairs with due diligence. <br /> In case of an emergency where, in the opinion of the Owner, Delay could cause serious loss or <br /> damage, repairs may be made prior to or concurrent with notice being sent to the Contractor. All <br /> expenses in connection with such repairs will be charged to the Contractor. <br /> D. In special circumstances where a particular item of equipment is placed in continuous service <br /> before Substantial Completion of all the Work, the correction period for that item may start to run <br /> from an earlier date if so provided in the Specifications. <br /> E. Where defective Work (and damage to other Work resulting there from) has been corrected or <br /> removed and replaced under this Paragraph 8.7, the correction period hereunder with respect to <br /> such Work will be extended for an additional period of one year after such correction or removal <br /> and replacement has been satisfactorily completed. <br /> F. Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation or <br /> warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a <br /> waiver of the provisions of any applicable statute of limitation or repose. <br /> ARTICLE 9 MEASUREMENT AND PAYMENT I <br /> 9.1 Payments to Contractor <br /> A. Schedule of Values I <br /> 1. The Contractor shall submit a Schedule of Values at least fifteen (15) days prior to <br /> submitting its first Application for Payment. If the Project contains Unit Price Work, in <br /> whole or in part, then the Schedule of Values for that portion of the Work shall also be based <br /> on unit prices. If the Bid form calls for a lump sum price, in whole or in part, then the <br /> Schedule of Values shall: reasonably allocate the Contract Sum among the various portions <br /> of the Work; be complete; be organized to include detailed breakdown of each major unit of <br /> the Work; be organized to correspond to Contractor's schedule; break down the Contract <br /> Sum showing the value assigned to each part of the Work; include an allowance for profit <br /> and Overhead; include Unit Price Work, if and to the extent indicated on the Bid form; be so <br /> 111 <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 38 <br />