My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> Representative will determine the amount of the adjustment of Contract Sum in <br /> accordance with 9.5. Adjustment Of Contract Sum; <br /> b. Payment for partially completed lump sum items will be as mutually agreed. If the <br /> parties cannot agree, the Owner's Representative will determine the amount of the <br /> adjustment of Contract Sum in accordance with 9.5. Adjustment Of Contract Sum; <br /> c. To the extent not paid for by the Contract Sum for the completed units of Work, the <br /> Owner will pay as part of the adjustment of Contract Sum those direct costs necessarily <br /> and actually incurred by the Contractor in reasonable anticipation of performing the <br /> Work that has been deleted or terminated; <br /> d. The total payment for any one item in the case of a deletion or partial termination shall <br /> not exceed the Bid price as modified by approved Change Orders less the estimated <br /> cost, including Overhead and profit, to complete the Work and less any amount paid to <br /> the Contractor for the item; <br /> e. If the entire remainder of the Contract is terminated, the total payment to the Contractor <br /> shall not exceed the total Contract Sum as modified by approved Change Orders less <br /> those amounts paid to the Contractor before the effective date of the termination; and <br /> f. No claim for damages of any kind or for loss of anticipated profits or consequential <br /> damages on deleted or terminated Work will be allowed because of termination or <br /> Change Order. Contract Time shall be adjusted as the parties agree. If the parties cannot <br /> agree,the Owner's Representative will determine the adjustment of Contract Time. <br /> 4. Acceptable materials ordered by the Contractor prior to the date the Work was terminated or <br /> deleted will either be purchased from the Contractor by the Owner at the actual cost and <br /> shall become the property of the Owner, or the Owner will reimburse the Contractor for the <br /> actual costs of returning these materials to the Suppliers. <br /> 5. If Contractor disagrees with the adjustment of Contract Sum determined by the Owner's <br /> Representative, Contractor may submit a Contract Claim for the difference between the <br /> amount determined by the Owner's Representative and the amount sought by the Contractor. <br /> 6. Contractor shall not be entitled to anticipated profits on deleted, terminated, or uncompleted <br /> I Work. <br /> 9.3 Charges to Contractor <br /> A. The Contractor shall pay the Owner on demand everything charged to it under the terms of this <br /> Contract. Such charges may be deducted by the Owner from money due or to become due to the <br /> Contractor under the Contract. The Owner may recover such charges from the Contractor or <br /> from its surety. <br /> B. Contractor agrees to pay the costs of overtime or excessive inspection and observation costs <br /> incurred by the Owner. Overtime inspection shall include inspection required during Saturdays, <br /> Sundays, City holidays and weekdays, in excess of 40 hours per week or outside of normal <br /> working hours and inspections or observations that result in an inspector or observer working <br /> more than forty hours in a week. Costs of such overtime or excessive inspection or observation <br /> include architecture, engineering, construction management services, inspection, general <br /> supervision and Overhead expenses which are directly chargeable to the overtime or excessive <br /> work. Contractor agrees that Owner will deduct such charges from payments due the Contractor. <br /> 1 In the event the Owner by Change Order requires the Contractor to work in excess of the <br /> established schedule of working hours, the Owner will not charge the Contractor for inspection <br /> costs associated therewith. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.