Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 9.4 Compensation to Owner for Time Extension <br /> A. The Owner shall be compensated by the Contractor for the actual costs to the Owner of <br /> engineering, inspection, general supervision, right-of-way costs, permit fees, Overhead expenses, <br /> and any other ascertainable direct costs to the Owner that are directly chargeable to the Work and <br /> which accrue during the period of such extension. The actual costs do not include charges for <br /> final inspection and preparation of the final payment by the Owner. <br /> 9.5 Adjustment of Contract Sum I <br /> A. Calculation <br /> 1. Except as otherwise expressly provided in these General Conditions, any and all adjustments <br /> of Contract Sum shall be determined as follows: <br /> a. If the parties are able to agree,the price will be determined by using: <br /> 1) Unit prices, if the Work items are defined by unit prices; and <br /> 2) Other prices agreed upon by the Contractor and Owner for Work not defined by <br /> unit prices. <br /> b. If the parties cannot agree, the Owner's Representative will determine the price <br /> pursuant to the following order: <br /> 1) Unit prices, if the Work items are defined by unit prices; and <br /> 2) Other means to establish the reasonable cost of the Work if it is not defined by <br /> unit prices, including, but not limited to, Force Account as described in 9.6. 1 <br /> Force Account, the Schedule of Values, or estimating manuals. <br /> B. Limitations <br /> 1. The following limitations shall apply in determining the amount of an adjustment: <br /> a. Except as otherwise expressly provided, Contractor will only be paid for costs it clearly <br /> and convincingly proves it actually and directly incurred, and shall not include <br /> 111 <br /> consequential or indirect damages not otherwise expressly permitted by the Contract <br /> Documents. Costs and damages for which Owner shall not be liable under any <br /> circumstances include,but are not limited to: (a)borrowing or interest costs, charges, or <br /> expenses of Contractor; (b) alleged lost profit or Overhead on any other project; and(c) <br /> Contractor's failure or inability to obtain other work. <br /> b. No Contract Claim for adjustment of Contract Sum or additional compensation for <br /> extra, affected, impacted or inefficient Work will be allowed where the Contractor does <br /> not keep and maintain contemporaneous, complete and accurate time records for labor <br /> and equipment and contemporaneous, complete and accurate records for materials and <br /> where such records do not contemporaneously segregate and allocate by time, location <br /> and work the time and costs for each item or element of such work. Contractor's failure <br /> to keep and maintain such records constitutes a waiver of any Contract Claim or request <br /> by the Contractor for adjustment of Contract Sum for such costs or event. <br /> c. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any <br /> Delay or extension of Contract Time, Contractor shall be compensated as provided in <br /> 12.4 Remedies. Such compensation shall be full, adequate and complete compensation <br /> for all direct, indirect, cumulative, inefficiency, impact and ripple costs causing, arising <br /> out of,or relating to such delays or extension. <br /> d. Contractor and Owner agree that compensation to the Contractor for a Contract Claim <br /> shall not exceed the Contractor's costs based upon Force Account as described in 9.6. <br /> Force Account. Contractor waives, releases, and agrees not to submit any request for <br /> adjustment of Contract Sum or Contract Claim based upon a "total cost" or "modified <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -44 1 <br />