My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> E. Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental <br /> Agreement will be maintained at each region office of the Washington State Department of <br /> Transportation and at each of the offices of the Associated General Contractors of America, in <br /> Seattle, Spokane, Tacoma, Washington and Wilsonville, Oregon, where they are available for <br /> inspection. <br /> 9.11 For Services. <br /> A. Compensation under Force Account for specialized services shall be made on the basis of an <br /> invoice from the providing entity. <br /> 1. A "specialized service" shall be one that is typically billed through invoice in standard <br /> industry practice. I <br /> 2. Before Work is started, the Owner's Representative may require the Contractor to obtain <br /> multiple quotations for the service to be utilized and select the provider with prices and <br /> terms most advantageous to the Owner. 111 <br /> 3. In the event that prior quotations are not obtained and the service invoice is submitted by <br /> the Subcontractor, then after-the-fact quotations may be obtained by the Owner's <br /> Representative from the open market in the vicinity and the lowest such quotation may be <br /> used in place of the submitted invoice. <br /> B. Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) percent <br /> of the sum of the costs included on invoices for specialized services to cover project Overhead, <br /> general company Overhead, profit, bonding, insurance, Business & Occupation tax, and other <br /> costs incurred. <br /> C. When a Supplier of services is compensated through invoice, but acts in the manner of <br /> Subcontractor, as described in 9.13 For Contractor Markup of Subcontractors Work of this <br /> provision, then markup for that invoice shall be according to 9.13 For Contractor Markup of <br /> Subcontractors Work. <br /> 9.12 For Mobilization. <br /> A. Force Account mobilization is defined as the preparatory work performed by the Contractor <br /> including procurement, loading and transportation of tools and equipment, and personal travel <br /> time, when such travel time is a contractual obligation of the Contractor or a customary payment I <br /> for the Contractor to all employees. <br /> 1. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. <br /> 2. Owner will pay for mobilization for off-site preparatory work for Force Account items <br /> provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity, if desired. <br /> B. Any costs experienced during mobilization activities for labor, equipment, materials or services <br /> shall be listed in that section of the Force Account summary and paid accordingly. I <br /> 9.13 For Contractor Markup on Subcontractor's Work. <br /> A. When Work is performed on a Force Account basis by one or more approved Subcontractors, by <br /> lower-tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a <br /> Subcontractor,the Contractor will be allowed an additional markup, from the table below, applied <br /> to the costs computed for Work done by each Subcontractor through 9.9.A, 9.7.B., 9.7.C, and <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -48 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.