My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> a. The Owner will pay the Contractor twenty-nine (29) percent of the sum of the costs <br /> listed in a, b, and c above to cover Project Overhead, general company Overhead, <br /> profit, and any other costs incurred. <br /> 9.9 Materials. <br /> A. The Owner will reimburse actual invoice cost for Contractor-supplied materials. <br /> 1. This cost includes actual freight and express charges and taxes, provided that these costs <br /> have not been paid in some other manner under the Contract. <br /> 2. A deduction will be made for any offered or available discounts or rebates if the Owner <br /> has provided the Contractor with the means to comply with the provisions allowing the <br /> discount. <br /> 3. The Owner will then add twenty-one (21) percent of the balance to cover Project <br /> overhead, general company Overhead,profit, and any other cost of supplying materials. <br /> B. To support charges for materials, the Contractor shall provide the Owner's Representative with <br /> authentic, complete and accurate copies of vendor invoices, including freight and express bills. <br /> 1. If invoices are not available for materials from the Contractor stocks, the Contractor shall <br /> certify actual costs by affidavit. <br /> C. If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br /> evidence, the Owner's Representative may determine the cost for all or part of the materials. <br /> 1. When determined in this manner, the cost will be the lowest current wholesale price from a <br /> source that can supply the required quantity, including delivery costs. <br /> D. The Owner reserves the right to provide materials. <br /> II. If so, the Contractor will receive no payment for any costs, Overhead, or profit on such <br /> materials. <br /> 9.10 Equipment. <br /> A. The equipment rates shall be actual cost but shall not exceed the rates set forth in the <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Work is performed, <br /> B. The approval of the Owner's Representative shall be required for the selection of machine-power <br /> tools or equipment prior to their use in Force Account situations. <br /> C. The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is <br /> authorized. <br /> 1. The rates as set forth in the Rental Rate Blue Book (as modified by the current <br /> AGC/WSDOT Equipment Rental Agreement) are the maximum rates allowable for <br /> equipment of modern design and in good working condition. <br /> ' a. These rates shall be full compensation for all fuel, oil, lubrication,repairs, maintenance, <br /> and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> D. The Owner will add twenty-one (21) percent to equipment costs to cover Project Overhead, <br /> general company Overhead (excluding equipment Overhead included in the Rental Rate Blue <br /> Book), and profit. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.