My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> 2. Deposited by the Owner in an escrow (interest-bearing) account in a bank, mutual saving <br /> bank, or savings and loan association (interest on monies so retained shall be paid to the <br /> Contractor). Deposits are to be in the name of the Owner and may not be withdrawn without <br /> the Owner's written authorization. The Owner will issue a check representing the sum of the <br /> monies reserved, payable to the bank or trust company. Such check shall be converted into <br /> bonds and securities chosen by the Contractor as the interest accrues. Bank and Contractor <br /> will execute an escrow agreement in the form provided by Owner. <br /> 3. Released after submission of fully executed retainage bond in the form provided by Owner. <br /> C. The Contractor shall designate the option desired at the time the Contract is executed. If the <br /> Contractor chooses option 2 (deposit in escrow account), Contractor agrees to assume full <br /> responsibility to pay all costs that may accrue from escrow services, brokerage charges or both, <br /> and further agrees to assume all risks in connection with the investment of the retained <br /> percentages in securities. <br /> D. Retainage will be released when all of the following conditions are satisfied: I <br /> 1. Sixty(60) days have elapsed following the completion of all Work specified in the Contract; <br /> and <br /> 2. The Contractor fulfilled all of all obligations of the Contractor under the Contract, including, <br /> but not limited to, the Contractor's furnishing all documentation required by Contract and <br /> law; and <br /> 3. A.release has been obtained from the Washington State Department of Revenue; and <br /> 4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the <br /> Owner(RCW 39.12.040); and <br /> 5. A release has been obtained from the Washington State Department of Labor & Industries <br /> and the Washington State Employment Security Department; and <br /> 6. All claims, as provided by law, filed against the retainage have been resolved. In the event <br /> claims are filed and provided the conditions one through five are met, the Contractor will be <br /> paid the retained percentage less an amount sufficient to pay any such claims together with a <br /> sum determined by the Owner sufficient to pay the cost of claims and attorney's fees. <br /> ARTICLE 10 NOTICE TO OWNER <br /> 10.1 When Notice Must Be Given <br /> A. The Contractor shall immediately give Notice to the Owner or Owner's Representative as <br /> provided in this section and elsewhere in the General Conditions and Specifications whenever: <br /> 1. The Contractor disagrees with any requirement, direction, interpretation or determination by <br /> the Owner or Owner's Representative; <br /> 2. The Contractor knows, or should with the reasonable exercise of ordinary care know, of a <br /> differing site condition as provided in ARTICLE 11. DIFFERING SITE CONDITIONS; <br /> 3. The Contractor knows, or should with the reasonable exercise of ordinary care know, of any <br /> Delay or an event that may cause a Delay; <br /> 4. The Contractor believes, or with the reasonable exercise of ordinary care should believe, it is I� <br /> entitled to an adjustment of Contract Sum or Time, even if the total or exact amount or <br /> impact cannot yet be determined; <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 50 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.