My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> B. General Contract and Subcontract Bidders are invited to attend. I <br /> C. Representatives of Murraysmith and the City of Everett will attend. <br /> D. Information relevant to Bidding Documents will be issued by Addenda. <br /> 1.11 INQUIRIES AND ADDENDA t <br /> A. Should a Bidder find what is believed to be discrepancies in or omissions from the Drawings or <br /> Specifications, or should the Bidder be in doubt as to their meaning, Bidder may submit to the <br /> City an emailed written request for an interpretation. <br /> B. Direct questions to: I <br /> 1. Prior to January 3, 2018 to Dave Voigt, at the office of Owner, DVoigt( everettwa.gov, <br /> (425)257-8983. <br /> 2. After January 3, 2018 to Souheil Nasr, at the office of Owner, SNasr@everettwa.gov, <br /> (425)257-7210. <br /> C. Verbal answers are not binding on any party. I <br /> D. Submit questions not less than seven days before date set for receipt of Bids. <br /> E. Addenda: <br /> 1. Replies will be made by Addenda,which may be issued during Bidding period. I <br /> 2. Addenda will be published online on Washington Builders Exchange website. <br /> 3. Addenda become part of Contract Documents. <br /> F. Include resultant costs in Bid Sum. <br /> 1.12 PRODUCT SUBSTITUTIONS <br /> A. Requests for product substitutions will not be accepted before execution of Contract. 1 <br /> B. Changes in the Work: <br /> 1. In submitting substitutions to specified products, Bidders shall include changes required I <br /> in the Work and changes to Contract Time or Contract Sum to accommodate such <br /> approved substitutions in their Bid. <br /> 2. Later claims by the Bidder for an addition to the Contract Time or Contract Sum because <br /> of changes in Work necessitated by use of substitutions will not be considered. <br /> C. Approval to submit substitution requests prior to submission of Bids is not required. I <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28,2017 <br /> WO#UP3620 00 21 13 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.