My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> greater than a monthly basis and specific identification of the types and <br /> amounts of Contractor Overhead Costs on no greater than a monthly <br /> basis for the actual Project duration. <br /> c. Overabsorbed Overhead <br /> 1) To demonstrate that it did not incur Overabsorbed Overhead in the period <br /> following the Delay(12.4.C.5.b.1)e)),the Contractor must: <br /> a) Affirmatively represent and warrant that completion of the delayed Work <br /> prevented the performance of other work; <br /> b) Identify the critical resource unavailable for other work due to completion of <br /> the delayed Contract; and <br /> c) Showing that unavailability of this critical resource precluded the <br /> performance of other work. <br /> D. Inefficiencies <br /> 1. Adjustment of Contract Sum <br /> a. To the extent Contractor is entitled to an increase in Contract Sum because of <br /> inefficiencies or impaired productivity, then compensation due, if any, shall be <br /> calculated as provided in 9.5. Adjustment Of Contract Sum. <br /> 2. Adjustment of Contract Time <br /> a. To the extent Contractor is entitled to an extension of Contract Time because of <br /> inefficiencies or impaired productivity, then the time extension, if any, shall be <br /> determined as provided in 5.2.C. Extensions of Contract Time. <br /> ARTICLE 13 DISPUTES <br /> 13.1 Resolution <br /> A. When a Dispute occurs during a Contract, the Contractor shall pursue resolution through the <br /> Owner's Representative. The Contractor shall follow the procedure outlined ARTICLE 12. <br /> CONTRACT CLAIMS herein and 5.2.C. Extensions of Contract Time for issues regarding <br /> the schedule and Contract Time. Timely and adequate Notice is a condition precedent to a <br /> Contract Claim. Timely and complete submission of a Contract Claim is a condition precedent to <br /> any entitlement by the Contractor to an adjustment of Contract Sum or Contract Time. Unless <br /> waived by the Owner, mediation is a condition precedent to the filing of any lawsuit, action or <br /> proceeding that seeks to recover on a Contract Claim, whether in whole or in part. <br /> 13.2 Continuing the Work <br /> A. Contractor shall carry on the Work and adhere to the schedule during all disputes or <br /> disagreements with Owner. No Work shall be delayed or postponed pending resolution of <br /> Disputes or disagreements, except as permitted by paragraph 15.04 or as Owner and Contractor <br /> may otherwise agree in writing. <br /> ARTICLE 14 TIME LIMITATIONS AND JURISDICTION <br /> 14.1 General <br /> A. The parties intend that all Claims and Disputes be dealt with promptly and expeditiously when <br /> they arise. The parties intend that all Claims and Disputes be resolved quickly and expeditiously <br /> and desire to avoid claims and Disputes that relate back to events or Work occurring months <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.