My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS I <br /> before. The parties desire to avoid litigation and the costs and expense of Claims and Disputes at <br /> the end of the Project. <br /> B. Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute or <br /> Contract Claim of any kind whatsoever, must be submitted, if at all, to the Owner or Owner's <br /> Representative no later than thirty (30) days after Notice was first required to be given by the <br /> Contractor as provided in ARTICLE 10. NOTICE TO OWNER. Failure to submit a Contract <br /> Claim within the thirty (30) days of the date Notice was required pursuant to ARTICLE 10. <br /> NOTICE TO OWNER constitutes a complete waiver of and bar to the Contract Claim, and <br /> Contractor is estopped from later asserting a Contract Claim or seeking any relief or remedy <br /> relating to the Dispute for which it failed to submit a Claim. <br /> C. Contractor may not sue, cross-claim, claim, or bring any action of any kind whatsoever against <br /> the Owner on any Contract Claim or Dispute after the expiration of one hundred eighty (180) <br /> days from Physical Completion. <br /> D. Any alleged cause of action by Owner or Contractor as to any acts or failures to act occurring <br /> prior to Substantial Completion shall be deemed to have accrued in any and all events not later <br /> than such date of Substantial Completion. <br /> ARTICLE 15 LIABILITY AND INSURANCE <br /> 15.1 General <br /> A. Contractor bears all risk of loss, casualty or damage to installed Work prior to Final Acceptance, <br /> irrespective of whether the Owner has taken possession of the Project in whole or in part and <br /> notwithstanding the existence or availability of insurance or the insurance coverages required by <br /> the Contract Documents. <br /> 15.2 Bonds <br /> A. Payment and Performance Bond <br /> 1. The Contractor shall provide a payment bond and a performance bond in the amount of 100 <br /> percent of the Contract Sum in the form required by the Contract. <br /> 2. This bond shall serve as security for the faithful performance of the Work and as security for <br /> the faithful payment and satisfaction of the persons furnishing materials and performing <br /> labor on the Work. 111 <br /> 3. The bond shall be issued by a corporation duly and legally licensed to transact surety <br /> business in the State of Washington. <br /> 4. Such bond shall remain in force throughout the period required to complete the Work, and <br /> thereafter for a period of three hundred sixty-five (365) calendar days after Final <br /> Acceptance. <br /> 5. The bond must be executed by a duly licensed surety company, which is listed in the latest <br /> Circular 570 of the United States Treasury Department, as being acceptable as surety on <br /> federal bonds. <br /> 6. No surety's liability on the bond shall exceed the underwriting limitations for the respective <br /> surety specified in Circular 570. <br /> 7. The scope of the bond or the form thereof prescribed in these Contract Documents shall in <br /> no way affect or alter the liabilities of the Contractor to the Owner as set forth herein. <br /> I <br /> Legion Golf Course Stormwater Detention Project November 28, 2017 <br /> WO#UP3620 00 72 13 - 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.