Laserfiche WebLink
I <br /> SECTION 01 10 00 - SUMMARY OF WORK <br /> PART 1 GENERAL <br /> ' This Summary of Work supplements and amplifies certain sections of the General Conditions and <br /> Supplementary General Conditions. The General Conditions and Supplementary General Conditions shall <br /> apply except as modified herein. These Special Provisions and additional technical specifications may <br /> contain occasional requirements not pertinent to the project. However, these specifications shall apply in <br /> all particulars insofar as they are applicable to this project. <br /> 1.1 APPLICABLE STANDARD SPECIFICATIONS AND PLANS <br /> City of Everett, Washington, "Design and Construction Standards and Specifications for <br /> Development", 2017 (Including all revisions at date of bid opening), apply except as may be <br /> modified herein. In the case of discrepancy, unless noted otherwise herein, the more restrictive <br /> provisions shall apply. <br /> 1.2 SCOPE OF WORK <br /> The work to be performed under these specifications and drawings consists of improvements to the <br /> Legion Memorial Golf Course for the installation of four new golf holes with the installation of <br /> three stormwater detention ponds with connecting stormwater conveyance. <br /> Site Work: <br /> a) Installation and maintenance of temporary erosion and sediment control to accommodate <br /> construction <br /> b) Temporary construction entrances <br /> c) Removal and replacement of existing fences and gates <br /> d) Removal of existing asphalt <br /> e) Removal of existing structures and pipes <br /> f) Construction surveying, staking,grading, and site preparation <br /> g) Site environmental protection measures <br /> ' h) Stormwater control and monitoring <br /> i) Sanitary Sewer Bypass <br /> j) Groundwater dewatering and disposal <br /> k) Traffic control <br /> 1) Asphalt and concrete paving <br /> m) Finish grading and site cleanup <br /> Stormwater Detention: <br /> a) Installation of new stormwater conveyance pipes and structures <br /> b) Connection to existing structures <br /> c) Excavation of stormwater ponds <br /> d) Placement of stormwater lining <br /> e) Installation of pond walls <br /> 1) Furnishing and installing control structures and appurtenances <br /> g) Installation of electrical conduits <br /> 111 h) Installation of pond aerators <br /> ' Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 01 10 00- 1 <br />