My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 01 10 00 - SUMMARY OF WORK <br /> PART 1 GENERAL <br /> ' This Summary of Work supplements and amplifies certain sections of the General Conditions and <br /> Supplementary General Conditions. The General Conditions and Supplementary General Conditions shall <br /> apply except as modified herein. These Special Provisions and additional technical specifications may <br /> contain occasional requirements not pertinent to the project. However, these specifications shall apply in <br /> all particulars insofar as they are applicable to this project. <br /> 1.1 APPLICABLE STANDARD SPECIFICATIONS AND PLANS <br /> City of Everett, Washington, "Design and Construction Standards and Specifications for <br /> Development", 2017 (Including all revisions at date of bid opening), apply except as may be <br /> modified herein. In the case of discrepancy, unless noted otherwise herein, the more restrictive <br /> provisions shall apply. <br /> 1.2 SCOPE OF WORK <br /> The work to be performed under these specifications and drawings consists of improvements to the <br /> Legion Memorial Golf Course for the installation of four new golf holes with the installation of <br /> three stormwater detention ponds with connecting stormwater conveyance. <br /> Site Work: <br /> a) Installation and maintenance of temporary erosion and sediment control to accommodate <br /> construction <br /> b) Temporary construction entrances <br /> c) Removal and replacement of existing fences and gates <br /> d) Removal of existing asphalt <br /> e) Removal of existing structures and pipes <br /> f) Construction surveying, staking,grading, and site preparation <br /> g) Site environmental protection measures <br /> ' h) Stormwater control and monitoring <br /> i) Sanitary Sewer Bypass <br /> j) Groundwater dewatering and disposal <br /> k) Traffic control <br /> 1) Asphalt and concrete paving <br /> m) Finish grading and site cleanup <br /> Stormwater Detention: <br /> a) Installation of new stormwater conveyance pipes and structures <br /> b) Connection to existing structures <br /> c) Excavation of stormwater ponds <br /> d) Placement of stormwater lining <br /> e) Installation of pond walls <br /> 1) Furnishing and installing control structures and appurtenances <br /> g) Installation of electrical conduits <br /> 111 h) Installation of pond aerators <br /> ' Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 01 10 00- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.