My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i) Installation of backflowP revention valves <br /> j) Pond access roads and reinforced turf areas <br /> Golf Improvements: <br /> a) Specialized work to protect the existing golf course during construction <br /> b) Clearing, shaping and reconstruction of golf playing surfaces across multiple acres of the <br /> course <br /> c) Site clearing and earthwork <br /> d) Site drainage and storm drainage system for golf course <br /> e) Irrigation work to modify existing golf course irrigation system <br /> f) Specialized golf specific grading and shaping to construct golf greens, tees, fairways, <br /> bunkers,golf hole features,ponds and playing surfaces <br /> g) Construction of golf course paths <br /> h) Coordination/relocation of impacted utilities, irrigation and concrete paving <br /> i) Specialized golf specific planting to include soil preparation, grassing of tees, greens, <br /> fairways, and other golf course playing surfaces to ensure proper preparation and successful <br /> grow in per USGA specifications <br /> The above general outline of principal features of the work does not in any way limit the <br /> responsibility of the CONTRACTOR(s) to perform all work and furnish all equipment, labor and <br /> materials required by the specifications and drawings. The drawings and specifications shall be <br /> considered and used together. Anything appearing as a requirement of either shall be accepted as <br /> applicable to both even though not so stated therein or shown. <br /> No attempt has been made in these specifications or drawings to segregate work covered by any <br /> trade or subcontract under one specification. Such segregation and establishment of subcontract <br /> limits will be solely a matter of specific agreement between the CONTRACTOR and its <br /> subcontractors and shall not be based upon any inclusion, segregation or arrangement in or of these111 <br /> specifications. <br /> 1.3 COORDINATION OF DRAWINGS AND SPECIFICATIONS I <br /> The drawings and specifications are intended to describe and provide for a complete work. Any <br /> requirement in one is as binding as if stated in all. The CONTRACTOR shall provide any work or <br /> materials clearly implied in the Contract Documents even if the Contract Documents do not <br /> mention it specifically. If there is a conflict within the Contract Documents, it will be resolved by <br /> the following order of precedence: <br /> A. Permits for outside agencies required by law <br /> B. OWNER-CONTRACTOR Agreement <br /> C. Addenda to Contract Documents I <br /> D. CONTRACTOR's Proposal <br /> E. Special Provisions <br /> F. Contract Drawings <br /> G. Technical Specifications <br /> H. Supplementary General Conditions <br /> I. General Conditions of the Contract <br /> J. City of Everett, Washington, "Design and Construction Standards and Specifications for <br /> Development", 2017 <br /> K. City of Everett Standard Plans <br /> Legion Golf Course Stormwater Detention Project Summary of Work , <br /> WO#UP3620 01 10 00 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.