My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Dimensions shown on the drawings or that can be computed shall take precedence over scaled <br /> dimensions. Notes on drawings are part of the drawings and govern in the order described above. <br /> Notes on drawings shall take precedence over drawing details. <br /> The intent of the drawings and specifications is to prescribe the details for the construction and <br /> ' completion of the work which the CONTRACTOR undertakes to perform according to the terms of <br /> the Contract. Where the drawings or specifications describe portions of the work in general terms, <br /> but details are incomplete or silent, it is understood that only the best general practice is to prevail <br /> ' and that only materials and workmanship of the best quality are to be used. Unless otherwise <br /> specified, the CONTRACTOR shall furnish all labor, materials, tools, equipment, and incidentals, <br /> and do all the work involved in executing the Contract in a manner satisfactory to the ENGINEER. <br /> The contract drawings are designated by general title, sheet number and sheet title. When reference <br /> is made to the drawings, the "Sheet Number" of the drawing will be used. Each drawing bears the <br /> ENGINEER's File No. Work Order 3620 and the general title: <br /> Legion Golf Course Stormwater Detention Project <br /> The specific titles of each sheet are listed on the Cover Sheet. <br /> 1.4 CODE REQUIREMENTS <br /> All work shall be done in strict compliance with the requirements of: <br /> A. International Building Code <br /> B. Uniform Mechanical Code <br /> C. Uniform Plumbing Code <br /> D. National Electric Code <br /> E. National Electric Safety Code <br /> F. Oregon State Department of Labor and Industries <br /> G. City of Everett Municipal Code <br /> H. Snohomish County Code <br /> In case of disagreement between codes or these specifications,the more restrictive shall prevail. <br /> 1.5 TIME OF COMPLETION/LIQUIDATED DAMAGES <br /> The CONTRACTOR shall complete all work shown and specified within the time limits stated in <br /> the Agreement. The written Notice to Proceed will be sent to the CONTRACTOR after the <br /> CONTRACTOR submits the signed Contract, Bonds and insurance certificates to the OWNER and <br /> those documents have been approved as to form and executed by the OWNER. The <br /> CONTRACTOR's attention is directed to the General Conditions as respects liquidated damages. <br /> 1.6 COORDINATION WITH OTHER CONTRACTORS AND WITH OWNER <br /> Certain work within this contract may require connection to and coordination with the work of <br /> other contractors and OWNER. The CONTRACTOR under these specifications shall cooperate <br /> ' fully with all other contractors and OWNER and carefully fit its own work to such other work as <br /> may be directed by the ENGINEER. The CONTRACTOR shall not commit or permit any act to be <br /> committed which will interfere with the performance of work by any other contractor or the <br /> OWNER. <br /> Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 01 10 00- 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.