My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
acceptable limits. All trucks shall be covered before they leave the loading area. <br /> The CONTRACTOR shall ensure that all drivers of vehicles transporting contaminated <br /> substances have in their possession during transport all applicable Oregon State and local <br /> vehicle insurance requirements, valid driver's license, and vehicle registration and <br /> license. The CONTRACTOR shall be responsible for informing all drivers of transport <br /> vehicle about: <br /> a. The nature of the material transported. <br /> b. Required routes to and from the off-site thermal treatment or disposal <br /> facility. <br /> c. Applicable County street regulations and requirements, and State of <br /> Oregon Department of Transportation codes, regulations and <br /> requirements. , <br /> d. The County's requirement for proper handling and transportation of the <br /> substances. , <br /> The CONTRACTOR shall not allow contaminated substances to be spilled or tracked <br /> off-site at any time during the project. Trucks used for the transportation of contaminated <br /> substances off-site shall be water tight, substance compatible, licensed, insured, and <br /> permitted pursuant to federal, state, and local statutes,rules,regulations and ordinances. <br /> If contaminated media is discarded prior to removal of contaminated material, the price , <br /> per cubic yard of soil materials and price per 100 gallons of contaminated water will be <br /> negotiated with OWNER. <br /> 1.45 PROJECT INFORMATION SIGNS <br /> The CONTRACTOR shall furnish and install project information signs in accordance with the <br /> following requirements: <br /> A. Two project information signs are required. <br /> B. A submittal for the project information sign(s) shall be prepared for the ENGINEER'S <br /> approval prior to fabrication. <br /> C. The CONTRACTOR shall install the project information sign(s) at location(s) as directed by <br /> the ENGINEER. <br /> D. No construction work shall commence on the project site until the project information signs , <br /> are installed. <br /> E. The CONTRACTOR shall maintain the signs through the duration of the project. , <br /> The project information sign(s) shall be constructed of 3/4-inch thick plywood with a finish grade of <br /> veneer on the sign face. The sign(s) shall be 48-inches high by 60-inches wide. The sign(s) shall be <br /> securely attached to two 4-inch square treated wood posts. The sign(s) shall be installed such that <br /> the top of the sign is approximately 10 feet above grade or as necessary to permit proper public <br /> Legion Golf Course Stormwater Detention Project Summary of Work <br /> WO#UP3620 01 10 00- 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.