I <br /> I <br /> 1 2. Construction Surveying& Record Drawings <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and equipment for the setting <br /> and monitoring the location, elevation, alignment and grade of the work, including establishing and <br /> staking of the proposed stormwater and utility improvements and other easement lines,public right of way <br /> lines, and existing and new fences, as required, to complete the work. This includes all work necessary to <br /> provide construction survey, control monuments, temporary bench marks, staking of tees, greens, fairway <br /> turning points, grade stakes, fairway centerline, roadways, cart paths, walls, boundaries, and other related <br /> surveying/staking necessary for golf course construction per Details and Specifications. <br /> The lump sum bid shall include the complete cost of providing all mark-up drawings necessary for the <br /> Owner to create accurate record drawings. Failure to comply with the requirements and furnish acceptable <br /> record drawing will result in the non-payment of a portion of this bid item as determined by the schedule <br /> of values,but no less than 10% of the value of this bid item. <br /> I <br /> 3. Temporary Erosion and Sediment Control <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for materials,work,labor and equipment necessary to <br /> provide erosion control, complete and in place throughout the term of the Contract. Also included are all <br /> costs for temporary and permanent erosion control measures needed to prevent silt from entering the storm <br /> drain,trenches or water courses or surrounding property as required in permits or as necessitated by climate, <br /> weather conditions and the Contractor's activities. <br /> Included in the lump sum price for this bid item are all costs for dust control, including but not limited to <br /> watering down work site, covering stock piles, limit traffic and traffic speeds, maintaining plant cover as <br /> long as possible, street cleaning and sweeping. <br /> Included in the lump sum price for this bid item are all costs for additional.temporary erosion control <br /> measures which may be required to support the Contractor's construction methods,including but not limited <br /> to, settling and filtering of water from dewatering operations, catch basin inserts, diversion and control of <br /> surface runoff into or out of trenches, straw mulch,protection of delivered or stockpiled backfill materials, <br /> protection of unsuitable or surplus materials and control, care and cleanup of petroleum products or other <br /> construction byproducts. <br /> Included in the lump sum price for this bid item are all costs for temporary erosion control measures that <br /> may be required at all access roads, haul routes, staging areas, material and equipment storage yards and <br /> other sites occupied or used by the Contractor. <br /> Measurement for temporary erosion and sediment control shall be the ratio of the number of working days <br /> completed to the number of working days authorized in the Contract. <br /> I <br /> 4. Shoring and Trench Safety <br /> I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00 -3 <br />