My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 2. Construction Surveying& Record Drawings <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and equipment for the setting <br /> and monitoring the location, elevation, alignment and grade of the work, including establishing and <br /> staking of the proposed stormwater and utility improvements and other easement lines,public right of way <br /> lines, and existing and new fences, as required, to complete the work. This includes all work necessary to <br /> provide construction survey, control monuments, temporary bench marks, staking of tees, greens, fairway <br /> turning points, grade stakes, fairway centerline, roadways, cart paths, walls, boundaries, and other related <br /> surveying/staking necessary for golf course construction per Details and Specifications. <br /> The lump sum bid shall include the complete cost of providing all mark-up drawings necessary for the <br /> Owner to create accurate record drawings. Failure to comply with the requirements and furnish acceptable <br /> record drawing will result in the non-payment of a portion of this bid item as determined by the schedule <br /> of values,but no less than 10% of the value of this bid item. <br /> I <br /> 3. Temporary Erosion and Sediment Control <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for materials,work,labor and equipment necessary to <br /> provide erosion control, complete and in place throughout the term of the Contract. Also included are all <br /> costs for temporary and permanent erosion control measures needed to prevent silt from entering the storm <br /> drain,trenches or water courses or surrounding property as required in permits or as necessitated by climate, <br /> weather conditions and the Contractor's activities. <br /> Included in the lump sum price for this bid item are all costs for dust control, including but not limited to <br /> watering down work site, covering stock piles, limit traffic and traffic speeds, maintaining plant cover as <br /> long as possible, street cleaning and sweeping. <br /> Included in the lump sum price for this bid item are all costs for additional.temporary erosion control <br /> measures which may be required to support the Contractor's construction methods,including but not limited <br /> to, settling and filtering of water from dewatering operations, catch basin inserts, diversion and control of <br /> surface runoff into or out of trenches, straw mulch,protection of delivered or stockpiled backfill materials, <br /> protection of unsuitable or surplus materials and control, care and cleanup of petroleum products or other <br /> construction byproducts. <br /> Included in the lump sum price for this bid item are all costs for temporary erosion control measures that <br /> may be required at all access roads, haul routes, staging areas, material and equipment storage yards and <br /> other sites occupied or used by the Contractor. <br /> Measurement for temporary erosion and sediment control shall be the ratio of the number of working days <br /> completed to the number of working days authorized in the Contract. <br /> I <br /> 4. Shoring and Trench Safety <br /> I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.