My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Measurement and Payment: LumpSum <br /> The lump sum bid shall constitute full compensation for all material, labor and equipment, complete <br /> and in place, for work necessary to protect all excavations. The installation of shoring and trench <br /> safety systems includes, but is not limited to, shoring, benching, bracing, excavating, sheeting and <br /> trench boxes as required by these Contract Documents and pertinent laws and regulations. <br /> Bidders attention is directed to the follow laws and regulations; Chapter 39.04.180 of the Revised <br /> Code of Washington (RCW), Part N of Chapter 296-155 of the Washington Administrative Code <br /> (WAC), Washington Industrial Safety and Health Act, Chapter 49.17 RCW and 29CFR 1926 of OSHA. <br /> Shoring shall be constructed with provisions made to allow Owner's Representative to enter shored trench <br /> at any time. <br /> Measurement and payment shall be based on a percentage of the work completed requiring shoring and <br /> trench safety. I <br /> 5. Dewatering I <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for dewatering and shall include all labor, material, <br /> tools and equipment necessary to prepare the Dewatering Plan and provide a dewatering system in <br /> accordance with specification 31 23 19 and to satisfactorily complete the work as defined in the Contract <br /> Documents. The lump sum price shall include all work to remove, treat and dispose of water generated <br /> from dewatering activities. <br /> Measurement and payment shall be based on a percentage of the work completed requiring dewatering in <br /> accordance with the Dewatering Plan. <br /> 6. Water Main Pipe, 12-inch Diameter,Ductile Iron I <br /> Measurement and Payment: Linear Foot <br /> The unit price bid per linear foot shall constitute full compensation for all material, labor and equipment, <br /> complete and in place and at grades specified in the plans,for all work to furnish and install 12-inch ductile <br /> iron water main pipe and all fittings,including transition couplings and bends. Measurement and Payment <br /> for water main laid and tested shall be made along the pipe, through fittings and structures. Included in, <br /> but not limited to,the unit price for this item are all costs for: <br /> • trench excavation, I <br /> • stockpiling excavated material, <br /> • protecting and/or maintaining existing utilities, <br /> • removing and disposing of existing piping and fittings, <br /> • furnishing,placing and compacting pipe bedding and pipe zone material, <br /> • furnishing and installing pipe, bends and fittings, <br /> • furnishing,placing and compacting suitable native backfill material, <br /> • cleaning, flushing, inspecting,testing, and disinfecting water pipe, <br /> • furnishing and installing transition couplings and connecting to existing pipe, I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment I <br /> WO#UP3620 01 22 00 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.