Laserfiche WebLink
I <br /> I <br /> 1 31. Stabilized Access Road <br /> Measurement and Payment: Ton <br /> The unit price bid per ton shall constitute full compensation for all material,labor and equipment,complete <br /> and in place and at grades specified in the plans, for all work to furnish and install the stabilized access <br /> roads. Measurement and Payment for stabilized access roads shall be made per ton of Class 50 riprap, <br /> geotextile per specification documents shall be considered incidental to the unit price. <br /> 32. Property Restoration <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and equipment, complete and <br /> in place, to restore all areas outside the golf course property as specified in the plans. Included in,but not <br /> limited to,the lump sum price for this item are all costs for: <br /> • protection of trees and roots per specifications, <br /> • protection of structures per specifications, <br /> • finish grading to match existing, <br /> • furnishing and installing top soil,mulch and seed, <br /> • establishment of new fence with mow strip, <br /> • reinstalling existing chain link fence along golf course property line, <br /> • planting of street trees. <br /> I <br /> 33. Electrical Service& Supply <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for furnishing electrical service and supply, complete <br /> and in place.The unit price shall include,but not be limited to,all labor,materials,and equipment to provide <br /> an electrical service to each aerator system. Included in,but not limited to,the lump sum price for this item <br /> are all costs for: <br /> • modifying exiting electrical panel, <br /> • properly sizing, furnishing and installing conductors, fuses,receptacles and all appurtenances <br /> • properly sizing,furnishing and installing buried conduit,handholes and all appurtenances, <br /> • furnishing and installing spare conduit, <br /> • providing all necessary permits and inspections, <br /> • start-up and testing, <br /> 34. Spray Herbicide and Topsoil Tilling <br /> Measurement and Payment: Acre <br /> I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00- 11 <br />