My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 31. Stabilized Access Road <br /> Measurement and Payment: Ton <br /> The unit price bid per ton shall constitute full compensation for all material,labor and equipment,complete <br /> and in place and at grades specified in the plans, for all work to furnish and install the stabilized access <br /> roads. Measurement and Payment for stabilized access roads shall be made per ton of Class 50 riprap, <br /> geotextile per specification documents shall be considered incidental to the unit price. <br /> 32. Property Restoration <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all material, labor and equipment, complete and <br /> in place, to restore all areas outside the golf course property as specified in the plans. Included in,but not <br /> limited to,the lump sum price for this item are all costs for: <br /> • protection of trees and roots per specifications, <br /> • protection of structures per specifications, <br /> • finish grading to match existing, <br /> • furnishing and installing top soil,mulch and seed, <br /> • establishment of new fence with mow strip, <br /> • reinstalling existing chain link fence along golf course property line, <br /> • planting of street trees. <br /> I <br /> 33. Electrical Service& Supply <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for furnishing electrical service and supply, complete <br /> and in place.The unit price shall include,but not be limited to,all labor,materials,and equipment to provide <br /> an electrical service to each aerator system. Included in,but not limited to,the lump sum price for this item <br /> are all costs for: <br /> • modifying exiting electrical panel, <br /> • properly sizing, furnishing and installing conductors, fuses,receptacles and all appurtenances <br /> • properly sizing,furnishing and installing buried conduit,handholes and all appurtenances, <br /> • furnishing and installing spare conduit, <br /> • providing all necessary permits and inspections, <br /> • start-up and testing, <br /> 34. Spray Herbicide and Topsoil Tilling <br /> Measurement and Payment: Acre <br /> I <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00- 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.