My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> The unit price bid per acre shall constitute full compensation for all labor, materials, tools, equipment, <br /> incidentals and all work necessary to spray-kill existing turf and till top 6 inches of topsoil to the lines and <br /> grades shown on the plans per topsoil details and specifications. I <br /> 35. Topsoil Stripping/Hauling I <br /> Measurement and Payment: Cubic Yard <br /> The unit price bid per cubic yard shall constitute full compensation for all labor,materials,tools,equipment, <br /> incidentals and all work necessary to remove, haul and stockpile tilled topsoil to the lines, amounts and <br /> grades shown on the plans. Such work includes soil analysis, and topsoil transport according to the plans <br /> and as specified. <br /> 36. Clearing 1 <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all labor, materials, tools, equipment and <br /> incidentals necessary to remove and properly dispose of exiting vegetation, trees, shrubs, stumps, grasses, <br /> and other items in the designated work limits which are not to remain or be incorporated into the work. <br /> 37. Cart Path Removal <br /> Measurement and Payment: Lump Sum <br /> The lump sum bid shall constitute full compensation for all labor, materials, tools, equipment and <br /> incidentals necessary for the demolition and removal of asphalt Golf Course Cart path including road base <br /> and proper disposal per plans, details and specifications. <br /> I <br /> 38. Shaping <br /> Measurement and Payment: Lump Sum 1 <br /> The lump sum bid shall constitute full compensation for all materials, equipment, labor and supervision of <br /> all operations necessary for shaping the features of a golf hole. Items typically included in the shaping will I <br /> be greens, tees, bunkers, fairways, roughs, swales, lakes, ponds and streams, or other items as specified. <br /> Shaping consists of the artistic manipulation of graded or existing land or soil to obtain the features <br /> designated by iConGolf Studio in the plans and as directed in the field. Finish Shape golf course soils to <br /> +/- 1 inch of golf course sub-grade to the lines and grades indicated on the plans. Includes rough shaping <br /> of imported material to the lines and grades indicated on the plans. <br /> I <br /> 39. Golf Course Catch Basin,8-inch <br /> 40. Golf Course Catch Basin, 10-inch 1 <br /> 41. Golf Course Catch Basin, 12-inch <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.