My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 48. Golf Course Greens—Grass <br /> Measurement and Payment: Square Foot I <br /> The unit price bid per square foot shall constitute full compensation for all labor,materials,tools,equipment <br /> and incidentals as required for the complete installation of golf course greens in accordance with the <br /> contract documents. Such work shall include fabrication,excavation,installation,grading,and other work <br /> necessary for complete installation to the lines and grades indicated on the plans. <br /> 49. Golf Course Tees-Grass <br /> Measurement and Payment: Square Foot I <br /> The unit price bid per square foot shall constitute full compensation for all labor,materials,tools,equipment <br /> and incidentals as required for the complete installation of golf course tees in accordance with the contract <br /> documents. Such work shall include fabrication,excavation,installation,grading,and other work necessary 111 <br /> for complete installation to the lines and grades indicated on the plans. Tees to use "Laser Level" <br /> technology. <br /> 111 <br /> 50. Golf Course Construction-Bunkers <br /> Measurement and Payment: Square Foot <br /> The unit price bid per square foot shall constitute full compensation for all labor,materials,tools,equipment I <br /> and incidentals as required for the complete installation of golf course bunkers in accordance with the <br /> contract documents. Such work shall include fabrication,excavation,installation, grading, and other work <br /> necessary for complete installation. Included in,but not limited to,the unit price for this item are all costs <br /> for drainage, liner and sand associated with the golf course bunkers. <br /> 51. Cart Path • <br /> I <br /> Measurement and Payment: Square Foot <br /> The unit price bid per square foot shall constitute full compensation for all labor,materials,tools,equipment <br /> and incidentals as required for the complete installation of cart path in accordance with the contract <br /> documents. Such work shall include excavation, furnishing, placing and compacting 6 inches of crushed <br /> top course surfacing and other work necessary to form cart path subgrade and furnishing and placing 3 <br /> inches of asphalt on prepared subgrade as designated on plans per cart path details and specifications. <br /> Incidentals shall include, but not limited to, topsoil backfill material on both sides of cart path edge such <br /> that seed or sod is flush to the finished cart path grade elevation. <br /> 52. Cart Path Curbing <br /> Measurement and Payment: Linear Foot <br /> 111 <br /> The unit price bid per linear foot shall constitute full compensation for all labor,materials,tools,equipment <br /> and incidentals as required for the complete installation of cart path curbing in accordance with the contract <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00 - 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.