My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> documents. Such work shall include furnishing and installing anchor rods, extruded concrete curb, <br /> construction joints and other work necessary as designated on plans, details and specifications. <br /> 53. Topsoil Placement <br /> Measurement and Payment: Cubic Yard <br /> The unit price bid per cubic yard shall constitute full compensation for all labor,materials,tools,equipment, <br /> ' incidentals and all work necessary to place 6 inches of the existing tilled Topsoil on Fairways and Roughs <br /> to the lines and grades shown on the plans. Such work includes soil analysis, sand placement, grading, <br /> compaction,and any other work necessary to place 6 Inch Top Soil planting medium according to the plans <br /> and as specified. <br /> 54. Sand Plating Topsoil <br /> Measurement and Payment: Cubic Yard <br /> The unit price bid per cubic yard shall constitute full compensation for all labor,materials,tools,equipment, <br /> incidentals and all work necessary to furnish and place 6 inches of Sand Cap on Fairways and Roughs to <br /> the lines and grades shown on the plans. Such work includes soil analysis, sand placement, grading, <br /> compaction, and any other work necessary to place 6 Inch Sand Cap planting medium according to the <br /> plans and as specified. <br /> 55. Finishing <br /> Measurement and Payment: Acre <br /> The unit price bid per acre shall constitute full compensation for all labor, materials, tools, equipment, <br /> incidentals and all work necessary to bring all golf course turf areas into a turf grass planting ready <br /> condition.The unit price shall include,but not limited to,preparation of plating material,cleaning and fine <br /> grading of tees,greens,bunkers,fairways,roughs and non-use areas to produce a proper seed bed for seed, <br /> sprigs or sod. <br /> 56. Soil Amendments <br /> Measurement and Payment: Acre <br /> The unit price bid per acre shall constitute full compensation for all materials, equipment, labor, tools, <br /> incidentals, and all work necessary to apply and incorporate the necessary soil amendments and pre-plant <br /> fertilizers in accordance with the plans and specifications. <br /> I <br /> 57. Planting—Greens <br /> 58. Planting—Tees <br /> Measurement and Payment: Square Foot <br /> Legion Golf Course Stormwater Detention Project Measurement and Payment <br /> WO#UP3620 01 22 00- 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.