1 <br /> • Fall protection plan • Pedestrian access around <br /> • Emergency Action Plan work site during construction <br /> • Housekeeping and after hours <br /> • Safety training requirements <br /> and certification <br /> 2. The Project Health and Safety Plan shall also address best management practices associated <br /> with working in the upland cleanup area of the Everett Smelter Cleanup Site, refer to <br /> Section 01 10 00 1.10. <br /> 3. If the project requires other health and safety issues to be addressed, they too shall be <br /> included in the Project Health and Safety Plan. The Program shall subsequently be <br /> distributed to and implemented by the Contractor's personnel,as well as its Subcontractors <br /> and Suppliers. Contractor shall fully implement and comply with the Safety Program and <br /> shall submit to the Owner a letter signed by Contractor's owner/president affirming such <br /> implementation and compliance within fifteen (15) days after on-site work has started. <br /> Contractor shall notify the Owner when safety meeting will be held so that Owner's <br /> personnel may attend. A copy of the approved Health and Safety Plan must be maintained <br /> on-site at all times during the life of the Project. <br /> 2.5 CLOSE OUT SUBMITTALS <br /> A. Operation and Maintenance(O&M) Instructions <br /> I1. Submit preliminary O&M materials for review by Engineer. These shall be submitted <br /> according to"Submittal Procedures" Article.The equipment manufacturer may furnish <br /> instruction manuals prepared specifically for the equipment furnished or standard <br /> manuals may be used if statements like"if your equipment has this accessory..." or <br /> listings of equipment not furnished are eliminated. O&M materials will be returned to <br /> the Contractor for resubmittal if the O&M materials do not clearly indicate what specific <br /> equipment was furnished and all items not provided being clearly crossed out. Poorly <br /> reproduced copies are not acceptable. Operation and maintenance instructions shall <br /> contain the following as a minimum: <br /> a. Approved shop drawings and submittal data; <br /> b. Model,type, size and serial numbers of equipment furnished; <br /> c. Equipment and driver nameplate data; <br /> d. List of parts showing replacement numbers; <br /> e. Recommended list of spare parts; <br /> f. Complete operating instructions including start-up, shutdown, adjustments, cleaning, <br /> etc.; <br /> g. Maintenance and repair requirements including frequency and detailed instructions; <br /> and <br /> I <br /> Legion Golf Course Stormwater Detention Project Submittal Procedures <br /> WO#UP3620 01 33 00-9 <br />