Laserfiche WebLink
I <br /> 3. Water sufficiently to settle topsoil and eliminate voids or air pockets around roots. <br /> 4. Allow for natural settlement of soil surface,and furnish and apply topsoil sufficient to bring <br /> to original finish grade after backfill settlement. <br /> ' H. Develop a watering cycle through hot weather months. <br /> I. If during excavation, any condition arises that threatens the survivability of the protected tree, <br /> or an unknown condition arises that affects the stability or integrity of the root system, notify <br /> the ENGINEER immediately. <br /> 3.5 DESIGNATED TREE REMOVAL PROCEDURES <br /> A. If designated tree removal is specified by ENGINEER, furnish labor, material, and equipment <br /> necessary for removing and/or salvaging existing trees, if necessary, as designated on the <br /> Drawings for removal. <br /> ' 1.Verify location and species with ENGINEER prior to removal. <br /> B. Salable logs or timber may be sold to CONTRACTOR's benefit upon notification and prior <br /> approval of OWNER. Upon approval,remove salable logs or timber promptly from site. <br /> 3.6 GRADING AND FILLING AROUND TREES <br /> i A. Maintain existing grade within drip line of trees unless otherwise indicated on the Drawings or <br /> directed by the ENGINEER. <br /> ' 3.8 MAINTENANCE OF PROTECTIVE MEASURES <br /> A. Maintain protective measures throughout the construction process. Immediately repair any <br /> alteration to protection measures throughout construction process.Repair or reinstall protective <br /> measures immediately upon alteration. Monitor protective measures daily. <br /> 1 B. Remove and clear area of debris and fencing, barricades, etc., upon final written approval of <br /> ENGINEER. <br /> END OF SECTION <br /> 1 <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Temporary Tree&Plant Protection <br /> WO#UP3620 01 56 39-3 <br />