My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3. Water sufficiently to settle topsoil and eliminate voids or air pockets around roots. <br /> 4. Allow for natural settlement of soil surface,and furnish and apply topsoil sufficient to bring <br /> to original finish grade after backfill settlement. <br /> ' H. Develop a watering cycle through hot weather months. <br /> I. If during excavation, any condition arises that threatens the survivability of the protected tree, <br /> or an unknown condition arises that affects the stability or integrity of the root system, notify <br /> the ENGINEER immediately. <br /> 3.5 DESIGNATED TREE REMOVAL PROCEDURES <br /> A. If designated tree removal is specified by ENGINEER, furnish labor, material, and equipment <br /> necessary for removing and/or salvaging existing trees, if necessary, as designated on the <br /> Drawings for removal. <br /> ' 1.Verify location and species with ENGINEER prior to removal. <br /> B. Salable logs or timber may be sold to CONTRACTOR's benefit upon notification and prior <br /> approval of OWNER. Upon approval,remove salable logs or timber promptly from site. <br /> 3.6 GRADING AND FILLING AROUND TREES <br /> i A. Maintain existing grade within drip line of trees unless otherwise indicated on the Drawings or <br /> directed by the ENGINEER. <br /> ' 3.8 MAINTENANCE OF PROTECTIVE MEASURES <br /> A. Maintain protective measures throughout the construction process. Immediately repair any <br /> alteration to protection measures throughout construction process.Repair or reinstall protective <br /> measures immediately upon alteration. Monitor protective measures daily. <br /> 1 B. Remove and clear area of debris and fencing, barricades, etc., upon final written approval of <br /> ENGINEER. <br /> END OF SECTION <br /> 1 <br /> I <br /> I <br /> Legion Golf Course Stormwater Detention Project Temporary Tree&Plant Protection <br /> WO#UP3620 01 56 39-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.