My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodarte Construction Inc 2/14/2018
>
Contracts
>
Capital Contract
>
Rodarte Construction Inc 2/14/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 9:56:41 AM
Creation date
2/20/2018 9:52:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Rodarte Construction Inc
Approval Date
2/14/2018
Council Approval Date
1/24/2018
Department
Public Works
Department Project Manager
Nasr Souheil
Subject / Project Title
Legion Golf Course Stormwater Detention
Public Works WO Number
UP3620
Tracking Number
0001067
Total Compensation
$3,760,658.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Rodarte Construction Inc 10/30/2019 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC 12/18/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
RODARTE CONSTRUCTION INC. 6/12/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Protect against unauthorized cutting, breaking, skinning roots and branches, or bruising <br /> 1 <br /> bark. <br /> 4. Protect from smothering and compaction. <br /> a. Do not store construction materials or permit vehicles to drive or park within the drip , <br /> line area of any tree to remain. <br /> 5. Protect from dumping of refuse in close proximity. ' <br /> E. Where cutting is necessary, review conditions with the ENGINEER before proceeding, and <br /> comply with directives of ENGINEER. I <br /> 3.3 EXCAVATION AROUND TREES <br /> A. Excavate within drip lines of trees only where indicated on the Drawings or as directed by <br /> ENGINEER. <br /> B. Use trench boxes to decrease area of disturbance.• <br /> 1 <br /> C. Use root friendly soil excavation equipment such as pneumatic air compressor or low impact <br /> vactor. I <br /> D. Provide clean cut of roots using a saw. <br /> E. Where trenching for utilities is required within drip lines,tunnel under or around roots by hand <br /> excavating. <br /> 1. Where possible trench toward trunk of tree and tunnel under central root mass to avoid <br /> severing all lateral roots on side of trench. <br /> 2. Do not cut main lateral roots or tap roots over one inch in diameter. 111 <br /> 3. Temporarily support and protect trees from damage until permanently covered with <br /> approved backfill. <br /> F. Do not allow exposed roots to dry out before backfill is placed. <br /> 1. Provide temporary earth or burlap cover. <br /> 2. Water roots daily when exposed and maintain in a moist condition. ' <br /> G. Backfill roots only upon inspection approval from the ENGINEER. <br /> 111 <br /> 1. Backfill around root excavations only with clean imported topsoil free from materials <br /> deleterious to root growth. <br /> 2. Backfill to eliminate voids and compact only by means of manual tamping at root areas. <br /> 1 <br /> Legion Golf Course Stormwater Detention Project Temporary Tree&Plant Protection <br /> WO#UP3620 01 56 39 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.